My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: , 20 * <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: CR 512 RESURFACING & SHOULDER WIDENING FROM MYRTLE <br />STREET TO 126th AVENUE <br />Project No.: IRC -1305 <br />OWNER's Bid No. 2018009 <br />Project Description: This project will be performed for resurfacing of CR 512 from Myrtle <br />Street to 125th' Avenue. The proposed improvements will include milling of existin <br />pavement, installation of superpave asphaltic concrete, installation of signal mast arms <br />& associated controllers with video detection, widening paved shoulders, sodding an <br />installation of thermoplastic pavement markings, replacement of sidewalk curb returns <br />for ADA compliance and other ancillary construction work. This is a F.D.O.T. Sman <br />County Outreach Program (SCOP) funded project, FM No. 433068-1-54-01. <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 04-07 <br />00630-1 <br />FAPublicWorksXENGINEERING DIVISION PROJECTSk1305-CR 512 Resurf (SCOP)_Myrtle St to 125th SAAdmirrilbid documentsWaster Contract DocumentsX00630 - <br />Certificate of Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.