Laserfiche WebLink
materials and equipment,and the operations of <br />workers to the Site and other areas permitted <br />by Lovve and Raouladons, and ohsd| not <br />unreasonably encumber the Site and other <br />areas with construction equipment or other <br />materials orequipment. CONTRACTOR shall <br />moaurne full responsibility for any damage to <br />any such land or area, or to the owner or <br />occupant thereof, or of any adjacent land or <br />areas resulting from the performance of, the <br />Work. <br />2. Should any claim bemade by any <br />such owner or occupant because of the <br />performance ofthe Work, CONTRACTOR shall <br />promptly settle with such other party by <br />negotiation or otherwise resolve the claim by <br />arbitration or other dispute resolution <br />proceeding orotlaw. <br />3. To the fullest extent permitted by <br />Laws and Regulations, CONTRACTOR ohoU <br />indemnify and hold harmless C%88NER. <br />ENG1NEER, ENG\NEER's Consultant, and the <br />officono, d|raobons' partners, emp|cyeeo, agents, <br />and other consultants mfeach and any ofthem <br />from and against all o|aimne. oonbs. |ooaes, and <br />damages (including but not limited bo all fees <br />and charges of engineers, architects, attorneys, <br />and other professionals and all court or <br />arbitration or other dispute resolution costs) <br />arising out of or relating to any claim or action, <br />legal orequitable, brought by any such owner <br />oroccupant against OVVNER. ENG|NEER, or <br />any other party indemnified hereunder to the <br />extent caused by or based upon <br />C{]NTRACTOR'mperformance ofthe Work. <br />B. Removal ofDebris During Performance ofthe <br />Work., During the of the Work CONTRAC- <br />TOR shall keep the Site and other areas free from <br />accumulations of waste moheha|o, rubbish, and other <br />debris. Removal and disposal of such waste mcteh- <br />a|s.rubbish, and other debhsahsd|oonfonnboapp|ioa- <br />b|eLoxvaandRegu|otionm. <br />C. Cleaning. Prior to Substantial Completion of <br />the Work CONTRACTOR shall clean the Site and <br />make itready for utilization Adthe com- <br />pletion ofthe Work CONTRACTOR shall remove from <br />the Site all tools, appUanoes, construction equipment <br />and nmachinery, and surplus materials and ahoU <br />restore hooriginal oondhionoUpnopedynotdmo' noted <br />for alteration bythe Contract Documents. <br />D. Loading Structures: shall not <br />load nor permit any part of any structure to be loaded <br />in any manner that will endanger the atnuotune, nor <br />shall CONTRACTOR subject any part ofthe Work or <br />adjacent property to stresses or pressures that will <br />endanger it. <br />6.12 Record Documents <br />A. CONTRACTOR shall maintain in a safe place <br />edthe Site one record copy ofall Drawings, Specifica- <br />tions, Addenda, VVhtbon /hnandmnante. Change <br />(]ndere. Work Change 0nactives, Field Dndena, and <br />vxhMen inbsrprabadonaand o|ehficaUonoingood order <br />and annotated to show changes made during <br />construction. These record documents together with <br />all approved Samples and o counterpart of all <br />approved Shop Drawings will be ovoi|obka to ENGI- <br />NEER for reference. Upon completion of the Work, <br />these record dooumento. Samples, and Shop <br />Drawings will badelivered boENGINEER for OWNER. <br />6.13 Safety and Protection <br />A. CONTRACTOR shall besolely <br />for initiabrig, maintaining and supervising all safety <br />precautions and programs in connection with the <br />Work. CONTRACTOR shall take all necessary <br />precautions for the safety of, and ahoU providethe <br />necessary protection toprevent damage, injury or|ono <br />1. all persons onthe Site orwho may be <br />affected bvthe Work; <br />2. all the Work and materials and equip- <br />ment to be incorporated theren, whether in <br />storage on or off the Site; and <br />3. other property at the Site or adjacent <br />thxanabo, including bees. shrubs, |smvno, vvalka, <br />pavements, roadways, structures, utilities, and <br />Underground Facilities not designated for <br />removal, relocation, or replacement in the <br />course ofconstruction. <br />B. CONTRACTOR shall comply with all applica- <br />ble Laws and Regulations relating to the safety of <br />persons or property, or to the protection of persons or <br />property from damage, injury, or loss; and shall erect <br />and maintain all necessary safeguards for such safety <br />and protection. CONTRACTOR shall notify owners of <br />adjacent property and of Underground Facilities and <br />other utility owners when prosecution of the Work may <br />affect them, and shall cooperate with them in the <br />protection, removal, relocation, and replacement of <br />their property. All damage, injury, or loss to any <br />property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br />caused, directly or indirectly, in whole or in part, by <br />00700 - General Conditions REV 5-10-13 <br />0070o-23 <br />R\Public Works\ENGINEERINoDIVISION PROJECTS\1305-CR51e"esurf (SCOP)_Myrtlemw,25th St\.Adrnirn\bid docurnentsWaster Contract Dowments\00700'General Conditions <br />