Laserfiche WebLink
B. Bidder has visited the Site and become familiar with and is satisfied as to the gamensi <br />local and Site conditions that may affect cost, progress, and performance of the Work. <br />C.. Bidder is familiar with and is satisfied as to all federal, state and local Lovvo and <br />Regulations that may affect cost, progress and performance of the Work. <br />D. Bidder has carefully studied all: (1) reports Of explorations and tests of subsurface <br />conditions otorcontiguous tothe Site and all drawings of physicalconditions inorrelating to <br />existing surface or subsurface structures at or contiguous to the Site (except Underground <br />Facilities) vvhidl have been identified in the Supplementary Conditions as provided in <br />paragraph 4.02 of the General Conditions, and /2\ reports and drawings of o Hazardous <br />Environmental Condition, if any, vvh\oh have been identified in the Supplementary Conditions <br />asprovided inparagraph 4.0Gofthe General Conditions. <br />E. Bidder has obtained and carefully studied (or assumes responsibilityfor having done so) <br />all additional orsupplementary examinations, investigations, exp|onsdoma, tests, studies and <br />data concerning conditions (surfoCe. subsurface and Underground Facilities) at or contiguous <br />to the Site which may affect cost, progress, or performance of the Work or which relate to any <br />aspect of the nneona, rnothoda, teohniquea, sequences, and procedures of construction to be <br />employed by Bidder, including applying the specific means, methods, techniques, sequences, <br />and procedures of construction expressly required by the Bidding Documents to be employed <br />byBidder, and safety precautions and programs incident thereto. <br />F. Bidder does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the determination of this Bid for performance of the Work at <br />the price(s) bid and within the times and in accordance with the other terms and conditions of <br />the Bidding Documents. <br />G. Bidder isaware ofthe general nature ofwork tobe performed bvOWNER and others ed <br />the Site that relates to the Work as indicated in the Bidding Documents. <br />H. Bidder has correlated the information known to Bidder, information and observations <br />obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and <br />all additional axanninaUona, invastigoUono, exp!orations, teate, atudiea, and data with the <br />Bidding Documents. <br />i Bidder has given ENGINEER written notice of all cunflkcts, errors, ambigudkes, o/ <br />discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution <br />thereof by ENGINEER is acceptable to Bidder. <br />J. The Bidding Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for the performance of the Work for which this Bid is submitted. <br />4`01 Bidder further represents that this Bid is genuine and not made in the interest of Or on <br />behalf of any undisclosed individual or entity and in not submitted in conformity with any <br />agreement or rules ofany group, association, organization or corporation; Bidder has not <br />directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; <br />Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder <br />has not sought by collusion to obtain for itself any advantage over any other Bidder orover <br />OWNER. <br />[The remainder of page intentionally left blank] <br />oomo'Bid Form REV n* -0r <br />00m10 -z <br />p^PumicWorks\s GINEERING DIVISION PROJECTS\ 1305 -CR 512 Resurf(SCOP)_Myrtle St to 125th St\Adrnim\bid docurnentsMaster Contract ooc"m"m*" 310 am <br />