My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. K ENGINEER does not render o formal <br />decision in writing within the time stated in paragraph <br />10.06.13. a decision denying the C|oinn in its entirety <br />shall bodeemed b» have been issued 31 days after <br />receipt of the |mmt submittal of the claimant orthe iont <br />submittal ofthe opposing party, ifany. <br />D. No Claim for an adjustment in Contract Price <br />or Contract Times (or Milestones) will be valid if not <br />submitted inaccordance with this paragraph 10.05. <br />ARTICLE 11 - COST OFTHE WORK; CASH <br />ALLOWANCES; UNIT PRICE WORK <br />11.01 CostoftheWork <br />A. CootsIncluded. The term. Cost ofthe Work <br />means the sum ofall costs necessarily incurred and <br />paid by CONTRACTOR inthe proper performance of <br />the Work. When the value ofany Work covered bve <br />Change Order or when a C|einn for on adjustment in <br />Contract Price is determined on the basis ofCost of <br />the Work, the costs to be reimbursed to <br />CONTRACTOR will be only U)ona additional or <br />incremental costs required because of the change in <br />the Work orbecause ofthe event giving rise to the <br />Claim. Except as otherwise may be agreed to in <br />writing bvOWNER, such costs shall boinamounts no <br />higher than those prevailing in the locality of the <br />Project, shall include only the following ibomns, and <br />shall not include any of the costs itemized in para- <br />graph 11.01.13. <br />2. Coot of all materials and equipment <br />fumished and incorporated in the Work, includ- <br />ing costs of transportation and storage thereof, <br />noludingozatoofbanopodationandsbonagetheroof, <br />and Suppliers' field services required in <br />connection therewith. All cash discounts shall <br />accrue to CONTRACTOR unless OWNER <br />deposits funds with CONTRACTOR with which <br />to nnaho poymnenta, in which case the cash <br />discounts shall accrue to OWNER. fd| trade <br />diocounbs, rebates'and refunds and returns <br />from aa|o of surplus materials and equipment <br />shall accrue toOWNER, and CONTRACTOR <br />shall nnokm provisions so that they may be <br />obtained. <br />3. Payments made by CONTRACTOR <br />to Subcontractors for Work performed by <br />If required by OWNER, CON- <br />TRACTOR mhoU obtain competitive bids from <br />oubountnucbona acceptable to OWNER and <br />CONTRACTOR and ohoU deliver such bids to <br />C}VVNER, who will thendetennine. with the <br />advice ofENGINEER, which bids, ifany, will bo <br />acceptable. |fany subcontract provides that the <br />Subcontractor ietobo paidonthe basis ofCost <br />of the Work plus m fee. the Subcontractor's <br />Coat of the Work and fee shall be determined <br />in the same manner as CONTRACTOR'a Cost <br />of the Work and fee as provided in this para- <br />graph 11.01. <br />4. Costs of special consultants <br />but not limited to <br />architectn, testing labonabzhao, <br />attomeyo, and accountants) employed for <br />services specifically related to the Work. <br />5. Supplemental costs including the <br />a. The proportion of necessary trans- <br />portation, <br />tnavei and subsistence expenses of <br />CQNTR\CTOR's employees incurred in dis- <br />charge of duties connected with the Work. <br />is-ohorgeofduUaaconnectedwiththeVVork. <br />b. Cost, including transportation and <br />maintenonce, of all mnabahals, supplies, equip- <br />ment, machinery,mooiancea, office, and <br />temporary facilities otthe Site, and hand tools <br />not owned bvthe workers, which are consumed <br />in the performance of the VVork, and cost, |eaa <br />market value, of such items used but not con- <br />sumed which remain the property of CON- <br />TRACTOR. <br />00700 - General Conditions REV 5-10-13 <br />00m-32 <br />F:�Pubfic Works\ENGINEERINaDWISION PROJECTSN1305-CR512Resurf (SCOP)_Myrtlemm125th St\Admim\bid documentsWaster Contract Documents\00700'General Conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.