of intention tocover the same and
<br />ENGINEER hos not acted with reasonable prompt-
<br />ness
<br />13.04 Uncovering Work
<br />A. If any Work iscovered contrary to the written
<br />request ofENGINEER, it must, if requested bvENGI-
<br />NEER. be uncovered for ENG|NEER.s observation
<br />and replaced et C(]NTRA[TOFyoexpanms.
<br />B. If ENGINEER considers it necessary or
<br />advisable that covered Work be observed by ENGI-
<br />NEER or inspected or tested by others, CONTRAC-
<br />TOR, at ENGINEER's request, shall uncover, expose,
<br />ONTRAC'TOR.sdENG|NEER'orequeet.ahaUuncove[empone.
<br />or otherwise make available for observation, inspeo-
<br />bon, or testing as ENGINEER may nsquina, that
<br />portion of the Work in quootion, furnishing all neces-
<br />sary labor, material, and equipment |fitkafound that
<br />such Work is defective, CONTRACTOR shall pay all
<br />Claims, costs, losses, and damages (including but not
<br />limited boall fees and charges ofengineers, architects,
<br />ottorneyn, and other professionals and all court or
<br />arbitnafionorother dispute resolution costs) arising out
<br />of or relating to such uncovehng, exposure, observa-
<br />tion, 'inspeoUon, and testing,and of satisfactory
<br />replacement or naconnbooUon (including but not
<br />limited toall costs ofrepair orreplacement ofwork of
<br />others); OWNERanOWNERshall be entitled ba an
<br />'.
<br />appropriate decrease in the Contract Price. If the
<br />parties are unable toagree ashothe amount thereof,
<br />OWNER may make a Claim therefor asprovided in
<br />paragraph 10.05. If, hovmavm|. such Work is not found
<br />bzbedefective, CONTRACTOR shall be allowed an
<br />increase in the Contract Price or an extension of the
<br />Contract 7lnnms (on W1ilestonem), or both, dinaodv
<br />attributable to such uncovehnQ, exposune,
<br />obsen/adon, insoenUon, basbng, wap|ooemont, and
<br />reconstruction. 1fthe parries are unable to agree as to
<br />the amount or extent thereof, CONTRACTOR may
<br />make a Claim therefor as provided in paragraph
<br />10.05.
<br />13.05 OWNER May Stop the Work
<br />13.06 Correction orRemoval oyDefective Work
<br />A. CONTRACTOR nho| correct all defective
<br />Work, whether or not fmbhcobad, instaUmd, or
<br />completed, or, ifthe Work has been rejectedbvENG1-
<br />NEER. remove it from the Project and replace it with
<br />Work that ianot defective. CONTRACTOR shall pay
<br />all Claims, costs, |oaaes, and damages (including but
<br />not limited to all fees and charges of angineans,
<br />architeots, attonneya, and other professionals and all
<br />court orarbitration or other dispute resolution costs)
<br />arising out oforrelating tosuch correction orremoval
<br />(including but not limited to all costs of repair or
<br />replacement ofwork ofothers).
<br />13.07 Correction Period
<br />A.
<br />.
<br />#*m,. If CONTRACTOR does not promptly comply
<br />with the terms of such instructions, or in an
<br />emergency where delay would cause serious risk of
<br />loss or darnage. OWNER may have the defective
<br />Work corrected orrepaired ormay have the rejected
<br />\Kborh removed and nap|ocmd' and all C|aimna, ooabs,
<br />l000eo, and damages (including but not limited Noall
<br />faao and charges of engineers, onzh|bacts, ottornays,
<br />and other professionals and all court ororbdnadonor
<br />other dispute resolution costs) arising out oforrelating
<br />to such correction or repair or such nernovo| and
<br />replacement (including but not limited to all costs of
<br />repair oreplacement ofvmorkofothers)xviUbepaidbv
<br />CONTRACTOR.
<br />00700 - General Conditions REV 5-10-13
<br />00mo'37
<br />p:Wublicvm**ewamse*waDIVISION pxqJEGTmoO5-Cnmenes" mcopuMyrtl°mto 125mut\Aumm\bmum=mentmwmsterContract omcum°muam0D'General Conditions