of intention tocover the same and <br />ENGINEER hos not acted with reasonable prompt- <br />ness <br />13.04 Uncovering Work <br />A. If any Work iscovered contrary to the written <br />request ofENGINEER, it must, if requested bvENGI- <br />NEER. be uncovered for ENG|NEER.s observation <br />and replaced et C(]NTRA[TOFyoexpanms. <br />B. If ENGINEER considers it necessary or <br />advisable that covered Work be observed by ENGI- <br />NEER or inspected or tested by others, CONTRAC- <br />TOR, at ENGINEER's request, shall uncover, expose, <br />ONTRAC'TOR.sdENG|NEER'orequeet.ahaUuncove[empone. <br />or otherwise make available for observation, inspeo- <br />bon, or testing as ENGINEER may nsquina, that <br />portion of the Work in quootion, furnishing all neces- <br />sary labor, material, and equipment |fitkafound that <br />such Work is defective, CONTRACTOR shall pay all <br />Claims, costs, losses, and damages (including but not <br />limited boall fees and charges ofengineers, architects, <br />ottorneyn, and other professionals and all court or <br />arbitnafionorother dispute resolution costs) arising out <br />of or relating to such uncovehng, exposure, observa- <br />tion, 'inspeoUon, and testing,and of satisfactory <br />replacement or naconnbooUon (including but not <br />limited toall costs ofrepair orreplacement ofwork of <br />others); OWNERanOWNERshall be entitled ba an <br />'. <br />appropriate decrease in the Contract Price. If the <br />parties are unable toagree ashothe amount thereof, <br />OWNER may make a Claim therefor asprovided in <br />paragraph 10.05. If, hovmavm|. such Work is not found <br />bzbedefective, CONTRACTOR shall be allowed an <br />increase in the Contract Price or an extension of the <br />Contract 7lnnms (on W1ilestonem), or both, dinaodv <br />attributable to such uncovehnQ, exposune, <br />obsen/adon, insoenUon, basbng, wap|ooemont, and <br />reconstruction. 1fthe parries are unable to agree as to <br />the amount or extent thereof, CONTRACTOR may <br />make a Claim therefor as provided in paragraph <br />10.05. <br />13.05 OWNER May Stop the Work <br />13.06 Correction orRemoval oyDefective Work <br />A. CONTRACTOR nho| correct all defective <br />Work, whether or not fmbhcobad, instaUmd, or <br />completed, or, ifthe Work has been rejectedbvENG1- <br />NEER. remove it from the Project and replace it with <br />Work that ianot defective. CONTRACTOR shall pay <br />all Claims, costs, |oaaes, and damages (including but <br />not limited to all fees and charges of angineans, <br />architeots, attonneya, and other professionals and all <br />court orarbitration or other dispute resolution costs) <br />arising out oforrelating tosuch correction orremoval <br />(including but not limited to all costs of repair or <br />replacement ofwork ofothers). <br />13.07 Correction Period <br />A. <br />. <br />#*m,. If CONTRACTOR does not promptly comply <br />with the terms of such instructions, or in an <br />emergency where delay would cause serious risk of <br />loss or darnage. OWNER may have the defective <br />Work corrected orrepaired ormay have the rejected <br />\Kborh removed and nap|ocmd' and all C|aimna, ooabs, <br />l000eo, and damages (including but not limited Noall <br />faao and charges of engineers, onzh|bacts, ottornays, <br />and other professionals and all court ororbdnadonor <br />other dispute resolution costs) arising out oforrelating <br />to such correction or repair or such nernovo| and <br />replacement (including but not limited to all costs of <br />repair oreplacement ofvmorkofothers)xviUbepaidbv <br />CONTRACTOR. <br />00700 - General Conditions REV 5-10-13 <br />00mo'37 <br />p:Wublicvm**ewamse*waDIVISION pxqJEGTmoO5-Cnmenes" mcopuMyrtl°mto 125mut\Aumm\bmum=mentmwmsterContract omcum°muam0D'General Conditions <br />