My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-131B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-131B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 1:07:40 PM
Creation date
8/20/2018 1:46:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/17/2018
Control Number
2018-131B
Agenda Item Number
8.I.
Entity Name
Community Asphalt
Subject
County Road 512 Resurfacing and Shoulder Widening
Contract Documents & Specifications
Area
Myrtle Street to 125th Avenue
Project Number
IRC-1305
Bid Number
2018-009
Alternate Name
CR 512
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br />TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br />G. Immediately on delivery, Contractor shall inspect shipment to assure: <br />1. Product complies with requirements of Contract Documents and reviewed <br />submittals. <br />2. Quantities are correct. <br />3. Containers and packages are intact, labels are legible. <br />4. Products are properly protected and undamaged. <br />1.3 PRODUCT HANDLING <br />A. Provide equipment and personnel necessary to handle products, including <br />those provided by OWNER, by methods to prevent soiling or damage to <br />products or packaging. <br />B. Provide additional protection during handling as necessary to prevent scraping, <br />marring or otherwise damaging products or surrounding surfaces. <br />C. Handle products by methods to prevent bending or overstressing. <br />D. Lift heavy components only at designated lifting points. <br />E. Materials and equipment shall at all times be handled in a safe manner and as <br />recommended by manufacturer or supplier so that no damage will occur to <br />them. Do not drop, roll or skid products off delivery vehicles. Hand carry or use <br />suitable materials handling equipment. <br />+ + END OF SECTION + + <br />01610-2 <br />FAPubIicWorks\ENGINEERING DIVISION PROJECTS\1305-CR512 Resurf (SCOP)_Myrtle St to 125thSt\Admim\bid documents\Master <br />Contract Documents\01 610 -Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.