Laserfiche WebLink
SECTION 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, except as <br />modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section <br />consists of maintaining traffic within the limits of the project for the duration of the <br />construction period, including any temporary suspensions of the work. It shall <br />include the construction and maintenance of any necessary detour facilities; the <br />providing of necessary facilities for access to residences, businesses, etc., along <br />the project; the furnishing, installing and maintaining of traffic control and safety <br />devices during construction, the control of dust through the use of calcium chloride <br />if necessary, and any other special requirements for safe and expeditious <br />movement of traffic as may be called for on the plans. The term, Maintenance of <br />Traffic, as used herein, shall include all of such facilities, devices and operations <br />as are required for the safety and convenience of the public as well as for <br />minimizing public nuisance; all as Specified in this Itemized Section 14 of these <br />provisions and Paragraph 24 in General Conditions Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor <br />shall present his Maintenance of Traffic Plan at the pre -construction conference. <br />The Maintenance of Traffic Plan shall indicate the type and location of all signs, <br />lights, barricades, striping and barriers to be used for the safe passage of <br />pedestrians and vehicular traffic through the project and for the protection of the <br />workmen. The plan will indicate conditions and setups for each phase of the <br />Contractor's activities. <br />When the. project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of <br />Traffic Plan that become necessary shall also be approved in writing. Except in <br />an emergency, no changes to the approved plan will be allowed until approval to <br />change such plan has been received. <br />The cost of all work included in the Maintenance of Traffic Plan shall be included <br />in the pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on <br />the project and replace all equipment and devices not conforming with the <br />approved standards during that inspection. The project personnel will be advised <br />of the schedule of these inspections and be given the opportunity to join in the <br />inspection as is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design, <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />01025-2 Technical Specifications <br />FAIRublic Works\ENGINEERING DIVISION PROJECTS\1 305 -CR 512 Resurf (SCOP)_Myrtle St to 125th St\Admim\bid <br />documents\Master Contract Documents\Technical Specifications - 100% Submittal - Rev 02-11-06-17.docx <br />