Laserfiche WebLink
a satisfactory condition until final acceptance of the project. Such maintenance <br />shall include repairing of any damaged areas and replacing areas in which the <br />establishment of the grass stand does not appear to be developing satisfactorily. <br />Replanting or repair necessary due to the Contractor's negligence, carelessness <br />or failure to provide routine maintenance shall be at the Contractor's expense. <br />The Contractor shall maintain the sodded area up to the final acceptance date as <br />directed by the Engineer. Grass height shall not exceed 6" without mowing. <br />Clippings shall be removed from sidewalk. <br />K. Article 570-9. The first two paragraphs under this Article are deleted and the <br />following is added: <br />The contract unit price for performance turf shall include the costs of sod, fertilizer <br />(2 applications), sidewalk sweeping after mowing, mowing, pegging disposal of <br />clippings, water, tools, equipment, labor and all other incidentals necessary. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 570-1-2 — Performance Turf - Sod (Bahia) - Per Square Yard <br />SECTION 630 — CONDUIT <br />The work specified in this item shall conform to Section 630 of the Florida Department <br />of Transportation Standard Specifications for Road and Bridge Construction: <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 630-2-11 — Conduit, Furnish & Install, Open Trench — Per Linear <br />Foot <br />Bid Item No. 630-2-12 — Conduit, Furnish & Install, Directional Bore — Per Linear <br />Foot <br />SECTION 632 — SIGNAL CABLE <br />The work specified in this item shall conform to Section 632 of the Florida Department <br />of Transportation Standard Specifications for Road and Bridge Construction: <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 632-7-1 — Signal Cable — New or Reconstructed Intersection, <br />Furnish & Install — Per Installation <br />01025-20 Technical Specifications <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1305-CR 512 Resurf (SCOP)_Myrtle St to 125th St\Admim\bid <br />documents\Master Contract Documents\Technical Specifications - 100% Submittal - Rev 02 11-06-17.docx <br />