Laserfiche WebLink
24" X 36"'X 30" HANDHOLE DETAIL <br />U.S. <br />36 24' LRAME <br />NXl C � <br />I <br />i <br />SECTION A—A 3' tSH IRS SECTION B—B <br />, �� I a Y <br />L_ ONLY a <br />DOWN (iX) <br />VIEW C <br />B 1. PLACE 6' OF 3/4' CRUSHED ROCK IN THE BORON OF THE EXCAVATION. <br />TOP VIEW 2_ WIRE MESH (TWO SQUARES PER INCH) SHALL BE `ED <br />OYER INE <br />ROCK. IT WILL BE NECESSARY TO CUT OPENINGS FOR HDPE IN WIRE MESH. <br />�35 S/B' —{ A, H CENTERED <br />L OVER <br />BE SET RUSH WITH EPER TY GRADE AND IN LINE WITH NAIVE SOIL <br />4 CHOPE D OVER ON UI BSHM.L ED L PER TYPICAL <br />4. NOPE SDR II CONDUIT SHALL DE PLACED IN THE CORNERS OF <br />HAHOHD E <br />5.TERMINATE THE HOPE CONDUIT A MINIMUM OF SIX (6) INCHES ABOVE <br />THE WIRE MESH. DO HOT TERMINATE HDPE SDR 11 CONDUIT MORE THAN <br />EIGHT AC INCHES ABOVE THE PARE MESH. <br />8. PLACE EXPANSION PWGS IN ALL CONDUITS. 6' OF 3/4' <br />7. <br />95% <br />W <br />COMPACTION IN e' LILTS OR 2 SACK NIX ARNO HANDHOLE.CRUSHED ROCK <br />S. NO HANOHOLES ARE TO BE PLACED WITHIN THE DITCHLINE. <br />COVER <br />Fi:cRl�- <br />Puxl+In <br />K C I"mn;"nom <br />TOWER CLOUD <br />Qdle6onym,4p. <br />-- `-°, <br />-- <br />UK <br />cp- <br />RACX <br />FKUt ILL <br />DCITVRE <br />OVTR <br />TOWER CLOUD HANDHOLE <br />WIRE MESH T <br />VARIES <br />HOPE SIZE AS SPECIFIED <br />* No. 56545 <br />APR 18 2018 l STATE OF <br />FTPFL0137 ��j/�T4�`•LO_i <br />TOWER CLOUD FIBER 6E5 �NFII IIIXO <br />NOTTOSCALE wEfi NO' <br />H <br />U21609 <br />+n m- BURN B. 41 T8l 1018 <br />