My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 12 <br />FLORIDA POWER & LIGHTCOMPANY <br />(Continue front Sheet No. 9.033) <br />Attachment A <br />Original Sheet No. 9.033.1 <br />5.5.f A certificate addressed to FPL from a Licensed Professional Engineer (reasonably acceptable to <br />FPL in all respects) stating: (a) the nameplate capacity ratinit of the Facility at the anticipated time orcommercial <br />operation, which nmst be at least 94%ofthe Expected Nameplate CanacityRating; (b) that the Facility is able to <br />£operate electric energy reliably in Amounts expected by this Agreement and in accordance with all other terms and <br />conditimts hcrcoP (c) that Start -00 Testing of the Ftcility° has been competed: and d) that, pursuant to Section 9.4. <br />all s Item protection and control and Automatic Generation Cartrol devices are installed and operational_ <br />5.5.2 A certificate addressed to FPL from a Licensed Professional Engineer (reasonably acceptable to FPL in all <br />respects) stating, in conformance with the renuirements of the Interconnection Agreement. that (a) all required <br />interconnection fatilities have been constructed: (b) all required interconnection tests have been completed; and (c) <br />the Facility is phvsically interconnected with the System in conformance with the Interconnection Agreement and <br />Able to deliver cnergv consistent with the term%ofthis Agreement. <br />5.5.3 A certificatc addressed from a Licensed Professional Engineer (reasonably acceptable to FPI, in all <br />respecq) slating that OS has obtaiped or entered into all permits And agreciocntc with respect to the Facilitv <br />ncce%sary for cpnstruction. ownership, operation, and maintenance orihe 17acility (the "Required Agreements'). OS <br />must provide copies ofanv_or all Required Agreements requested by FPL. <br />5.5A An opinion from a law firm or attomev, rceisterFd or licensed in the State of Florida (reasonably <br />acceRiable to FPL in all respects). stating. aficr all appropriate and reasonable inquiry, that: (a) QS has obtained or <br />entered into all Required Agreements: (b) neither QS nor the Facility is in violation pf or %uhiect to an liy ability <br />under atty applicable laws; and (c) OS has duly riled and had recorded all orthe agreements, documents, instrumerus, <br />mortgages, deeds oftmst, and other ssritines described in Section 9.7. <br />5.5,5 FPL has received (tie Completion/Performance Securitv((a) through (e). the "Commercial Operation <br />Conditions"). <br />FPL shall have ten (10) Business Days after receipt either to confirm to OS that all of the Delivery Date Conditions <br />have been satisfied or have occurred, or to state with specificity what FPL reasonably believes has not been <br />satisfied. <br />5.6 The QS shall be entitled to receive capacity payments beginning on the Capacity Delivery Date, provided. the <br />Capacity Delivery Date occurs on or before the in-service date of the Avoided Knit (or such later date permitted by <br />FPL pursuant to the following sentence). If the Capacity Delivery Date docs not occur on or before the Guaranteed <br />Capacity Delivery Date, IPL shall be entitled to the Conipletion(Perronnance Security (as set forth in Section 9) in <br />full, and in addition, has the right but not the obligation to allow the QS tip to an additional five (5) months to <br />achieve the Capacity Delivery Date. If the QS fails to achieve the Capacity Deliver), Date either by (a) the <br />Guaranteed Delivery Date or b) such later date as permitted by FPL. FPI. shall have no obligation to make any <br />capacity payments under this Contract and FPL will be pennitted to terminate this Contract, consistent with the <br />terms herein, without further obligations, duties or liability to the QS. <br />(Continue on Sheet No. 9.034) <br />Issued by: Tiffany Cohen, Director, Rates and Tariffs <br />Effective: <br />wiz <br />
The URL can be used to link to this page
Your browser does not support the video tag.