My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 14 <br />Attachment A <br />Second Revised Sheet No. 9.035 <br />FLORIDA POWER & LIGHT COMPANY Cancels First Sheet No. 9.035 <br />(Continued from Sheet No. 9.034) <br />Electricity Production and Plant Maintenance Schedule <br />8.1 During the term of this Contract, no later than sixty (60) days prior to the Capacity Delivery Date and prior to April I of each <br />calendar year thereafter, the QS shall submit to FPL in writing a detailed plan of. (a) the amount of firm capacity and energy to be generated <br />by the Facility and delivered to the Delivery Point for each month ofthe following calendar year, and (b) the time, duration and magnitude of <br />any scheduled maintenance period(s) and any anticipated reductions in capacity. <br />81 By October 31 of each calendar year, FPL shall notify the QS in writing whether the requested scheduled maintenance periods <br />in the detailed plan are acceptable. If FPL objects to any ofthe requested scheduled maintenance periods, FPL shall advise the QS ofthe time <br />period closest to the requested period(s) when the outage(s) can be scheduled. The QS shall schedule maintenance outages only during <br />periods approved by FPL, such approval not unreasonably withheld. Once the schedule for maintenance has been established and approved <br />by FPL, either Parry may request a subsequent change in such schedule and, except when such event is due to Force Majeure, request <br />approval for such change from the other Party, such approval not to be unreasonably withheld or delayed. Scheduled maintenance outage <br />days shall be limited to seven (7) days per calendar year unless the manufacturer's recommendation of maintenance outage days for the <br />technology and equipment used by the Facility exceeds such 7 day period, provided, such number of days is considered reasonable by <br />prudent industry standards and does not exceed two (2) fourteen (14) day intervals, one in the Spring and one in the Fall, in any calendar <br />year. The scheduled maintenance outage days applicable for the QS are _ days in the Spring and _ days in the Fall of each calendar <br />year, provided the conditions specified in the previous sentence are satisfied. in no event shall maintenance periods be scheduled during the <br />following periods: June I through and including October 31st and December 1 through and including February 28 (or 296 as the can may <br />be). <br />8.3 The QS shall comply with reasonable requests by FPL regarding day-to-day and hour -by -hour communication between the <br />Parties relative to electricity production and maintenance scheduling. <br />$A Dispatch and Control <br />8.4.1 The power supplied by the QS hereunder shall be in the form of three-phase 60 Hertz alternating current, at a nominal <br />operating voltage of 000 volts ( kV) and power factor dispatchable and controllable in the range of 85% lagging to <br />SS% leading as measured at the Delivery Point to maintain system operating parameters, as specified by FPL. <br />8A.2 At all times during the term of this Contract, the QS shall operate arid maintain the Facility (a) in such a manner as to ensure <br />compliance with its obligations hereunder, in accordance with prudent engineering and operating practices and applicable law, and (b) with <br />all system protective equipment in service whenever the Facility is connected to, or is operated in parallel with, FPL's system. The QS shall <br />install at the Facility those system protection and control devices necessary to ensure safe and protected operation of all energized equipment <br />during normal testing and repair. The QS shall have qualified personnel test and calibrate all protective equipment at regular intervals in <br />accordance with good engineering and operating practices. A unit functional trip test shall be performed after each overhaul ofthe Fecility's <br />turbine, generator or boilers and the results shall be provided to FPL prior to returning the Facility to service. The specifics of the unit <br />functional trip test will be consistent with good engineering and operating practices. <br />8.4.3 If the Facility is separated from the FPL system for any reason, under no circumstances shall the QS reconnect the Facility <br />into FPL's system without first obtaining FPL's prior written approval. <br />8.4.4 During the term of this Contract, the QS shall employ qualified personnel for managing, operating and maintaining the <br />Facility and for coordinating such with FPL. If tha Facility has a Committed Capacity greater than 10 MW then, the QS shall ensure that <br />operating personnel are on duty at all times, twenty-four (24) hour's a calendar day and seven (7) calendar days a week. If the Facility has a <br />Committed Capacity equal to or less than 10 MW then the QS shall ensure that operating personnel are on duty at least eight (8) hours per <br />day from 8 AM FST to S PM EST from Monday to Friday, with an operator on call at all other hours. <br />8.4.5 FPL shall at all times be excused from its obligation to purchase and receive energy and capacity hereunder, and FPL shall <br />have the ability to require the QS to curtail or reduce deliveries ofenergy, to the extent necessary (a) to maintain the reliability and integrity <br />of any part of FPL's system, (b) in the event that FPL determines that a failure to do so is likely to endanger life or property, or (c) is likely to <br />result in significant disruption ofelectric service to FPL's customers. FPL shall give the QS prior notice, if pmctieable, of its intent to refuse, <br />curtail or reduce FPL's acceptance of energy and firm capacity pursuant to this Section and will act to minimae the frequency and duration <br />ofsuch occurrences. <br />(Continued on Sheet No. 9.036) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />T�H <br />
The URL can be used to link to this page
Your browser does not support the video tag.