My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 32 <br />Attachment A <br />Eighth Revised Sheet No. 10.304 <br />FLORIDA POWER & LIGHT COMPANY Cancels Seventh Revised Sheet No. 10304 <br />(Continued from Sheet No. 10303) <br />For any Dispatch dour the firm energy rate shall be, on an hour -by -hour basis, the Company's Avoided Unit Energy <br />Cost. For any other period during which energy is delivered by the QS to FPL, the firm energy rate in cents per <br />kilowatt hour (O/KWh) shall be the following on an hour -by -hour basis: the lesser of (a) the as -available, energy rate <br />calculated by FPL in accordance with FPSC Rule 25-17.0825, FAC, and FPL's Rate Schedule COG -1, as they may <br />each be amended from time to time and (b) the Company's Avoided Unit Energy Cost. The Company's Avoided <br />Unit Energy Cost, in cents per kilowatt-hour (¢/KWh) shall be defined as the product of: (a) the fuel price in <br />S/mmBTU as determined from gas prices published in Platts Inside FERC Gas Market Report, first of the month <br />posting for Florida Gas Transmission Zone 3, plus all charges, surcharges and percentages that are in effect from <br />time to time for service under Gulfstream Natural Gas System's Rate Schedule FTS; and (b) the average annual <br />heat rate of the Avoided Unit, plus (c) an additional payment for variable operation and maintenance expenses <br />which will be escalated based on the actual Producer Price Index. All energy purchases shall be adjusted for losses <br />from the point of metering to the Delivery Point. The calculation of the Company's avoided energy cost resects the <br />delivery of energy from the geographical area of the Company in which the Delivery Point of the QS is located. <br />Option D- Fixed Firm Enerpv Payments Starting as early as the In -Service Dale ofthp OS Facility <br />The calculation of payments to the QS for energy delivered to FPL may include an adjustment at the election of the <br />QS in order to implement the provisions of Rule 25-17.250 (6) (b), F.A.C. Subsequent to the determination of full <br />avoided cost and subject to the provisions of Rule 25-17.0832(3) (a) through (d), F.A.C., a portion of the base <br />energy costs associated with the avoided unit, mutually agreed upon by the utility and renewable anergy generator, <br />shall be fixed and amortized on a present value basis over the term of the contract starting, at the election of the QS, <br />as early as the in-service date of the QS. "Base energy costs associated with the avoided unit means the energy <br />costs of the avoided unit to the extent the unit would have operated. The portion of the base energy costs mutually <br />agreed to by the Company and the QS shall be specified in Appendix E. Tice Company will provide the QS with a <br />schedule of "Fixed Energy Payments" over the term of the Standard Offer Contract based on the applicable <br />information specified in Appendix E. <br />ESTIMATED AS -AVAILABLE ENERGY COST <br />As required in Section 25-17.0832, F.A.C. as -available energy cost projections until the in-service date of the avoided unit will <br />be provided within 30 days of receipt by FPL of a written request for such projections by any interested person. <br />ESTIMATED UNIT FUEL COST <br />As required in Section 25-17.0832, F.A.C. the estimated unit fuel costs associated with the Company's Avoided Unit and based <br />on current estimates of the price of natural gas will be provided within 30 days of a written request for such an estimate. <br />(Continued on Sheet No. 10.305) <br />Issued by: S. E. Romig, Director, Rates and Tariffs <br />Effective: September 13, 2016 <br />TJ 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.