My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0316 -PAA -EQ <br />DOCKET NO. 20180083 -EQ <br />PAGE 44 <br />Attachment A <br />Second Revised Sheet No. 10.313 <br />FLORIDA POWER & LIGHT COMPANY Cancels First Revised Sheet No.10.313 <br />APPENDIX B <br />TO THE STANDARD OFFER CONTRACT <br />FOR THE PURCHASE OF FIRM CAPACITY AND ENERGY <br />FROM RENEWABLE ENERGY FACILITIES <br />OR QUALIFYING FACILITIES WITH A DESIGN CAPACITY OF 100 KW OR LESS <br />PAY FOR PERFORMANCE PROVISIONS MONTHLY CAPACITY PAYMENT CALCULATION <br />1. Mm" Capacity Payments (MCP) for each Monthly Belling Period shall be computed according to the following: <br />A. In the event that the Annual Capacity Billing Factor ("ACBF'), as defined below, is less than 80%, chert no Monthly Capacity Payment shall be <br />due. That is: <br />MCP a o <br />B. In the avant that the ACBF is equal to or greater than 80% but less than 94%, then the Monthly Capacity Payment shell be calculated by using <br />the following foram lir <br />MCP - BCP x [1+4x (ACBF-94%)] x CC <br />C. In the event that the ACBF is equal to or greater clan 94% thea the Monody Capacity Payment shall be calculated by using the following <br />PimtWa: <br />MCP - BCP x CC <br />Where: <br />MCP Monthly Capacity Payment in dollars. <br />BCP - Base Capacity Payment in SXW(Month as specified in FPL's Rate Schefide QS -2. <br />CC Committed Capacity in KW. <br />ACBF n Annual Capacity Billing Factor. This favor is calculated using the 12 months rolling average of the Monthly Capacity <br />Factor. This 12 month rolling average shall be defined as the sum of the 12 consecutive Monthly Capacity Favors <br />preceding the daze of calale@on, divided by 12. During the first 12 consecutive Monthly Billing Periods, commencing <br />with the first Monthly Billing 'Period in vAkb Capacity payments arc to be made, the calculation of the Anna! <br />Capacity Billing Favor shall be performed as Pillows: (a) during the first Monody Billing Period, the Annual Capacity <br />Billing Factor shall be equal to the Monthly Capacity Favor, (b) thereafter, the calculation of the Annual Capacity <br />Billing Factor shall be computed by dividing Me sum of the Monody Capacity Favors during the first yeafs Monody <br />Billing Periods in which Capacity payments are to be made by the number of Monthly Billing Periods which have <br />elapsed This calculation shall W performed at the end ereach Monthly Ogling Period until enough Monthly Billing <br />Periods have elapsed to calculate a true 12•moath rolling average Annual Capacity Billing Factor. Periods during <br />which the Facility has temporarily set its Committed Capacity equal to 0 KW due to a pores Majeure event pursuant to <br />Section 16 shall be excluded Rom the applicable capacity favor calculation. <br />MCF - Monthly Capacity Factor. The sum of (i) the Hourly Factors of the Non -Dispatch Hoots plus (ii) the Hourly <br />Favors of the Dispatch Hours or the Hourly factors of the hours when FPL requested reduced deliveries pursuant to <br />Sections 8.4.6 and 8.4.8 (Reduced Delivery Hour); divided by the number of hears in the Monthly Billing Period. <br />HFNDH Hourly Factor era Non -Dispatch Hour. The energy received ging the hour divided by the Committed Capacity. <br />For purposes of calculating the Hourly Favor of a Non -Dispatch Hour the energy received shall not exceed the <br />Committed Capacity. <br />HFDH Hourly Factor of a Dispatch Hour or a Reduced Delivery Hour. The scheduled energy received divided by the <br />scheduled energy requested. For purposes of calculating the Hourly Factor are Dispatch Hour or the Hourly Factor <br />era Reduced Delivery Hour the scheduled energy received shall not exceed the scheduled energy requested <br />On -Peak Hours d Those hours occurring Apel 1 through October 31 Mondays through Fridays, from 12 noon to 9:00 p.m. excluding <br />Memorial Day, Independence Day and Labor Day; and November I through March 31 Mondays through Fridays <br />from 6:00 a.m. to 10:00 am. and 6:00 p.m. to 10:00 p.m. prevailing Eastern time excluding Thanksgiving Day, <br />Christmas bay and New Year's Day. FPL shall have the right to change such On- Peak Hours by providing Mie QS <br />a minimum of thirty calendar days' advance notice. <br />Monthly Billing The period beginning an the first calendar day of each calendar month, except that the initial Monthly Billing <br />Period Period shall consist of the period beginning 12:01 a.m. on the Capacity Delivery Period Date and ending with <br />the last calendar day of such month. <br />Scheduled Energy and Dispatch Hours are as defined in Section 8.4.7 of the Standard Offer Comma <br />Issued by: S. E, Romig, Director, Rates and Tariffs <br />Effective: August 27, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.