My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/03/2018 (3)
CBCC
>
Meetings
>
2010's
>
2018
>
07/03/2018 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 2:21:44 PM
Creation date
8/21/2018 12:48:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 16 <br />DUKE <br />ENERGY, <br />Attachment A <br />Page 11 of 71 <br />SECTION No. IX <br />FOURTH REVISED SHEET NO. 9.410 <br />CANCELS THIRD REVISED SHEET NO 9.410 <br />"IEEE" means the Institute of Electrical and Electronics hngincers, 'Inc. <br />"Indemnified Partv" has the meaning assigned to it in Section 16. <br />"Indemnifyine Party' has the meaning assigned to it in Section 16. <br />"Initial Reduction Value" has the meaning assigned to it in Appendix B. <br />"Insurance Services Office" has the meaning assigned to it in Section 17. <br />"KVA" means one or more kilovolts -amperes of electricity, as the context requires. <br />"W''means one or more kilowatts of electricity, as the context requires. <br />"kWh" means one or more kilowatt-hours of electricity, as the context requires. <br />"Letter of Credit" means a stand-by letter of credit from a Qualified Institution that is acceptable <br />to DEP whose approval may not be unreasonably withheld. The Letter of Credit must provide <br />that DEF has the right to draw on the Letter of Credit in the event that less than twenty (20) <br />Business Days remain until its expiration and RP/QF has failed to renew the Letter of Credit or <br />provide replacement Eligible Collateral as required under this Agreement. <br />"LOI" means a letter of intent for fuel supply. <br />"MCPC" means the Monthly Capacity Payment for Option A. <br />"Monthly Billing'Pcriod" means the period beginning on the first calendar day of each calendar <br />month, except that the initial Monthly Billing Period shall consist of the period beginning 12:01 <br />a.m., on the Capacity Delivery Date and ending with the last calendar day of such month. <br />"Month ly.AvaiIability Factor" or "MAF" means the total energy received during the Monthly <br />Billing Period for which the calculation is made, divided by the product of Committed Capacity <br />and the total hours during the Monthly Billing Period. <br />"Monthly Capacity Payment" or "MGP" means the payment for Capacity calculated in <br />accordance with Appendix A. <br />"MW" means one or more megawatts of electricity, as the context requires. <br />"M Wh" means one or more.ntegawatt-]tours of electricity, as the context requires. <br />ISSUED BY: Javier.Portuondo, Director, Rates & Regulatory Strategy - FL <br />EFFECTIVE: June 9, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.