ORDER NO. PSC -2018 -0314 -PAA -EQ <br />DOCKET NO. 20180073 -EQ <br />PAGE 49 <br />�•� DUKE <br />ENERGY. <br />Attachment A <br />Page 44 of 71 <br />SECTION No, IX <br />SECOND REVISED SHEET N0.9.443 <br />CANCELS FIRST REVISED SHEET NO. 9A43 <br />ACBE = Annual Capacity Billing Factor. The ACBE shall be the electric <br />energy actually received by DEF for the 12 consecutive months <br />preceding the date of calculation excluding any energy received <br />during an event of Force Majeure in which the Committed Capacity <br />is temporarily set equal to 0 kW, divided by the product of the <br />Committed Capacity and the number of hours in the 12 consecutive <br />months preceding the date of calculation excluding the hours during <br />an event of Force Majeure in which the Committed Capacity is <br />temporarily set equal to 0 W. If an event of Force Majeurc occurs <br />during the 12 consecutive months preceding the date of calculation <br />in which the Committed Capacity is temporarily set to a value <br />greater than 0 kW then the 12 month rolling average will be pro- <br />rated accordingly. During the first 12 consecutive Monthly Billing <br />Periods commencing with the first Monthly Billing Period in which <br />Capacity Payments are to be made, the calculation of 12 -month <br />rolling average ACBF shall be performed as follows (a) during the <br />first Monthly Billing Period, the ACBF shall be equal to the <br />Monthly Availability Factor, (b) thereafter, the calculation of the <br />ACBF shall be computed by summing the electric energy actually <br />received by DEF for the number of full consecutive months <br />preceding the date of calculation excluding any energy received <br />during an event of Force Majeure in which the Committed Capacity <br />is temporarily set equal to 0 kW, divided by the product of the <br />Committed Capacity and the number of hours in the number of full <br />consecutive months preceding the date of calculation excluding the <br />hours during an event of Force Majeure in which the Committed <br />Capacity is temporarily set equal to 0 W. If an event of Force <br />Majeure occurs during the months preceding the date of calculation <br />in which the Committed Capacity is temporarily set to a value <br />greater than 0 kW then the 12 month rolling average will be pro- <br />rated accordingly. This calculation shall be performed at the end of <br />each Monthly Billing period until enough Monthly Billing Periods <br />have elapsed to calculate n true 12 -month rolling average ACBF. <br />MAF = Monthly Availability Factor. The total energy received during the <br />Monthly Billing Period for which the calculation is made, divided by <br />the product of Committed Capacity times the total hours during the <br />Monthly Billing Period. <br />Monthly = The period beginning on the first calendar day of each calendar <br />Billing month, except that the initial Monthly Billing Period shall consist of <br />Period the period beginning 12:01 a.m., on the Capacity Delivery Date and <br />ending with the last calendar day of such month. <br />ISSUED BY: Javier Portuondo, Director, Rates & Regulatory Strategy - FL <br />EFFECTIVE: April 29, 2013 <br />Q �9 <br />