Laserfiche WebLink
ORDER NO. PSC -2018 -0313 -PCO -EI <br />DOCKET NO. 2018000 1 -EI <br />PAGE 7 <br />ATTACHMENT A <br />Table 1 <br />FPL Revised Capacity Cost Recovery Factors <br />For the Period July -December, 2018 <br />Rate Schedule <br />$/kW <br />$/kWh <br />Reservation <br />Demand <br />Charge <br />(RDC) <br />$/kW10 <br />Sum of <br />Daily <br />Demand <br />Charge <br />(SDD) <br />$/kWli <br />RS1/RTRl <br />- <br />0.00234 <br />- <br />- <br />GS1/GST1 <br />- <br />0.00220 <br />- <br />- <br />GSD1/GSDT1/HLFT1 <br />0.70 <br />- <br />- <br />- <br />OS2 <br />- <br />0.00098 <br />- <br />- <br />GSLD1/GSLDTI/CSI/CST1/HLFT2 <br />0.84 <br />- <br />- <br />- <br />GSLD2/GSLDT2/CS2/CST2/HLFT3 <br />0.78 <br />- <br />- <br />- <br />GSLD3/GSLDT3/CS3/CST3 <br />0.79 <br />- <br />- <br />- <br />SST1T <br />- <br />- <br />$0.10 <br />$0.05 <br />SST1D1/SST1D2/SST1D3 <br />- <br />- <br />$0.11 <br />$0.05 <br />CILC D/CILC G <br />0.89 <br />- <br />- <br />- <br />CILC T <br />0.86 <br />- <br />- <br />- <br />MET <br />0.88 <br />- <br />- <br />- <br />OL1/SLI/SL1M/PL1 <br />- <br />0.00018 <br />- <br />- <br />SL2/SL2M/GSCU1 <br />- <br />0.00153 <br />- <br />- <br />Source: Schedule E1 -E, Appendix I, Page 5 of 20 from Mid -Course Petition. <br />1ORDC=((Total Capacity Costs )/(Projected Avg. 12CP @gen)(.10)(demand loss expansion factor)/12 months <br />"SDD=((Total Capacity Costs. )/(Projected Avg. 12CP @gen)(21 on peak days)(demand loss expn. factor)/12 <br />months <br />