My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:45:05 PM
Creation date
9/7/2018 1:24:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
08/14/2018
Control Number
2018-149B
Agenda Item Number
12 F.1.
Entity Name
W&J Construction Corp
Subject
Contract documents and specifications for North County Offices
New Office space and facilities
Project Manual
Area
Sebastian Corners 1919 US 1
Project Number
IRC-1744
Bid Number
2018059
Alternate Name
North County Offices
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR: <br />CONTRACT FOR: NORTH COUNTY OFFICES AT SEBASTIAN CORNERS <br />Project No.: IRC -1744 <br />Project Description: This project consists of the construction of ±8,400 S.F. of new office <br />space and related facilities for the relocation of Indian River County professional offices. <br />The project includes new restrooms, storefront window replacement, electrical and <br />plumbing work, raised floors and the replacement of rooftop air conditioning units. In <br />addition, site related improvements will include new parking lot striping, curb repair, <br />new external lighting and exterior building cleaning and repainting. <br />OWNER's Bid No. 2018059 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />T <br />And T <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure, to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the above date of Substantial Completion. <br />00630 - Certificate of Substantial Completion REV 0407 <br />00630-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1744 Sebastian Corners\1-Admin\Bid Documents\MasterContract\Master Contract Documents\00630 -Certificate of <br />Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.