Laserfiche WebLink
a. the Work is defective, or completed <br />Work has been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />+erre .E)GG..F Fe Ge of a., of the events eRuFner- <br />ated in aph 15.02.A. <br />C. Payment Becomes Due <br />D. Reduction in Payment <br />1. OWNER. may refuse to make <br />payment of the full amount recommended by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs 14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02.A. <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified; <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Title <br />A. CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />in the Project or not, will pass to OWNER no later than <br />the time of payment free and clear of all Liens. <br />14.04 Substantial Completion <br />A. When CONTRACTOR considers the entire <br />Work ready for its intended use CONTRACTOR shall <br />notify OWNER and ENGINEER in writing that the <br />entire Work is substantially complete (except for items <br />specifically listed by CONTRACTOR as incomplete) <br />and request that ENGINEER issue a certificate of <br />Substantial Completion. Promptly thereafter, <br />OWNER, CONTRACTOR, and ENGINEER shall <br />make an inspection of the Work to determine the <br />status of completion. If ENGINEER does not consider <br />the Work substantially complete, ENGINEER will <br />notify CONTRACTOR in writing giving the reasons <br />therefore. if ENGINEER GGnsiders the —1Ale„t <br />sul3stantially- Geanplete, € GINEER will prepaFe and - <br />d r_e to OWNER a tentative r1•f to f e h + « I <br />Gempletien whish shall fix the date f Substa„t�} <br />Gempletien. Therrre-shall he „«« erl te the r1•f + <br />before final n eRt Q A,AICC ell .h..h11_1e..e seve.. ,+.,..s <br />malice writte" ehieGtien +e ENGINEER as + <br />.z.o.,s of the -Gertifisate-er attaehed-lost. I# - after <br />sensidering suGhebieGtia,=rs, GIN <br />G, <br />that the oVeFk is not —substantially—Gemplete, <br />F=Alf_IAICF=R ..A,ill Md+hmA 14 days af+eF hm•c f the <br />in =R R9ti GONTRAGTOR <br />teRtatffive <br />in writing, stating the Feasens therefer. if, <br />Gensideratien of WNER'sebjel3tm,s, ENGINEER <br />ENGINEER will within said 14 days exeGete a„a <br />deli..°. +e ll1 NFR r`/IAITGAr`Tlll7 a .+ f '+' <br />FefleGtiR9 SUGh Granges { the «e. tati GeFtifiGate <br />as ENGINEER her, , i +ified f+ + t m <br />00700 - General Conditions REV 5-10-13 <br />00700-40 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1744 Sebastian Corners\1-Admin\Bid Documents\MasterContract\Master Contract Documents\00700 - General Conditions REV 5- <br />10-13.doc <br />