My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:45:05 PM
Creation date
9/7/2018 1:24:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
08/14/2018
Control Number
2018-149B
Agenda Item Number
12 F.1.
Entity Name
W&J Construction Corp
Subject
Contract documents and specifications for North County Offices
New Office space and facilities
Project Manual
Area
Sebastian Corners 1919 US 1
Project Number
IRC-1744
Bid Number
2018059
Alternate Name
North County Offices
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />m <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: NORTH COUNTY OFFICES AT SEBASTIAN CORNERS <br />OWNER's Project No. IRC -1744 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />❑ Unit Prices <br />❑ Lump Sum <br />❑ Other: <br />❑ By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />II Engineer's Records <br />II Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date: <br />* * END OF SECTION * * <br />00948-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1744 Sebastian Comers\1-Admin\Bid Documents\MasterContract\Master <br />Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.