My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:45:05 PM
Creation date
9/7/2018 1:24:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
08/14/2018
Control Number
2018-149B
Agenda Item Number
12 F.1.
Entity Name
W&J Construction Corp
Subject
Contract documents and specifications for North County Offices
New Office space and facilities
Project Manual
Area
Sebastian Corners 1919 US 1
Project Number
IRC-1744
Bid Number
2018059
Alternate Name
North County Offices
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />U/iCONSTRUCTION <br />CORPORATION <br />RESUMES <br />Years with W8J: <br />3 years <br />Years in Industry: <br />17 years <br />Licenses/Credentials: <br />General Contractor License <br />(inactive) <br />OSHA 30 <br />SWPPP <br />BRIAN SELI <br />Current Title: Superintendent <br />Project Role: Construction Superintendent <br />A superintendent's job is to run the day-to-day operations on the <br />construction site including controlling the short term schedule. Brian will <br />work closely with the Project Manager to refine and coordinate schedules <br />and responsibilities. Brian has extensive experience with field management <br />including: planning, implementation and coordination of multiple trades <br />and specialties as they relate to specific projects and he will ensure the best <br />practices are being executed. Brian is effective in communicating project <br />status and operational issues to the Project Manager. He is capable of <br />making clear, sound and accurate judgment decisions to keep the project <br />moving forward. It is mandatory that all superintendents are familiar <br />with all city and state requirements to assure code compliance and safety <br />regulations. <br />PROJECT EXPERIENCE <br />Brannon Civic Center <br />Construction of new single story civic center (13,900 gross square feet) with <br />associated sitework, parking and landscaping. Some unique construction <br />methods for this project are the auger cast piles, the large curtainwall <br />systems along the waterfront, and operable partitions within the building. <br />High end finishes, automatic window shades, a complete audio/visual and <br />intrusion detection package, and the site's close proximity to the Halifax <br />River all offer the City of New Smyrna Beach residents a stunning venue for <br />concerts, weddings and multiple other uses. New Smyrna Beach, FL <br />Health First Business Center and Renovation <br />Renovation of existing 2 -story, 60,000 SF building for Health First, Inc. <br />Complete interior demolition and remodel of office space. Includes all new <br />finishes, full mechanical, electrical and plumbing refit. New windows and <br />exterior paint. Rockledge, FL <br />Northside Presbyterian Church Expansion <br />12,000 square foot expansion of existing church. The sanctuary will seat up <br />to 400 parishioners, additional meeting and classroom space, a welcome <br />center, coffee bar and storage areas complete the design. Melbourne, FL <br />Prior to W8J <br />Brian was superintendent to multiple confidential projects for NASA. <br />Operations & Checkout Facility; 600,000 SF complete renovation <br />Pad 39B Catacomb Roof Replacement; 376 panels removed and rebuilt of <br />crawler launch pad; each panel weighed 30,000 pounds <br />Patrick Air Force Base Camera Site Facility; 3 -story rocket camera site <br />facility, high-technology administration <br />Launch Control Center; 4 -story, 140,000 SF high-technology building <br />Fire Suppression & Fire Alarm Replacement; replacement of fire <br />suppression and fire alarm systems in 9 NASA facilities; Brian received an <br />award for this work. <br />W&J CONSTRUCTION CORPORATION CGC 34068 <br />
The URL can be used to link to this page
Your browser does not support the video tag.