My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:45:05 PM
Creation date
9/7/2018 1:24:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Scope of Services
Approved Date
08/14/2018
Control Number
2018-149B
Agenda Item Number
12 F.1.
Entity Name
W&J Construction Corp
Subject
Contract documents and specifications for North County Offices
New Office space and facilities
Project Manual
Area
Sebastian Corners 1919 US 1
Project Number
IRC-1744
Bid Number
2018059
Alternate Name
North County Offices
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC - Sebastian Corners May 9, 2018 <br />• Dampers/damper actuators not integral to the HVAC equipment and/or associated wiring <br />• Mechanical Equipment Startup <br />• LEED commissioning and Enhanced Commissioning (Commissioning Agent) <br />• Provision, installation, and wiring of Duct Smoke Detectors <br />• Provision and installation of Control/ Motorized Dampers <br />• Work, material, and/or labor associated with Low Voltage Wiring for any other system not <br />specifically indicated above. <br />• Provision, installation, and wiring of Firestats and/or freezestats <br />• Work, material, and/or labor associated with Toilet Exhaust Fans. <br />• Provision and installation of Thermostat Guards <br />• Work, material, and/or labor associated with Ductless Split System or Mini -Split Units <br />• Work, material, and/or labor associated with integrating other existing pieces of equipment into <br />the Trane BAS, or integrating devices from the Trane BAS into any 3rd party BAS (if applicable) <br />• Work, material, and/or labor associated with integrating new units into an existing BMS, if <br />applicable <br />• Work, material, and/or labor associated with Existing Air Handling Units including but not <br />limited to their integration into the new Building Automation System <br />• Provision, installation and wiring of a high speed Ethernet communications network or any of <br />its components. <br />• Excludes provision and/or programming of a dedicated front end workstation of any kind. <br />o System interface to be achieved through standard internet browser <br />• Any scope of work not specifically outlined above <br />Sincerely, <br />James DeSousa & Chris Cowling <br />Trane U.S. Inc. — South Florida <br />6965 Vista Parkway North, Suite 11 <br />West Palm Beach, FL 33411 <br />Phone: (561) 683-1521 <br />This proposal is subject to your acceptance of the attached Trane terms and conditions. <br />FLD = Furnished by Trane U. S. Inc. / Installed by Equipment Proposal Page 3 of 6 <br />Others <br />
The URL can be used to link to this page
Your browser does not support the video tag.