My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. <br /> DATE OF ISSUANCE: ` EFFECTIVE DATE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Project: SEBASTIAN CORNERS ROOF REPLACEMENT <br /> OWNER's Project No. IRC-1765 <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive: <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> El Unit Prices El Contractor's Records <br /> II Lump Sum II Engineer's Records <br /> El Other: El Other: <br /> Q By Change Order: [l By Change Order: <br /> Estimated increase (decrease) of this Work Estimated increase(decrease) in Contract Times: <br /> Change Directive <br /> $ Substantial Completion: days; <br /> Ready for Final Completion: days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By: , By: <br /> CONTRACTOR(Signature) ENGINEER(Signature) OWNER(Signature) <br /> Date: Date: Date: <br /> ** END OF SECTION ** <br /> Work Change Directive Form <br /> 00948-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid <br /> DocumentsWlaster Contract Documents\Master Contract Documents\00948-Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.