Laserfiche WebLink
SECTION 00948 -Work Change Directive <br /> No. <br /> DATE OF ISSUANCE: ` EFFECTIVE DATE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Project: SEBASTIAN CORNERS ROOF REPLACEMENT <br /> OWNER's Project No. IRC-1765 <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive: <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> El Unit Prices El Contractor's Records <br /> II Lump Sum II Engineer's Records <br /> El Other: El Other: <br /> Q By Change Order: [l By Change Order: <br /> Estimated increase (decrease) of this Work Estimated increase(decrease) in Contract Times: <br /> Change Directive <br /> $ Substantial Completion: days; <br /> Ready for Final Completion: days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By: , By: <br /> CONTRACTOR(Signature) ENGINEER(Signature) OWNER(Signature) <br /> Date: Date: Date: <br /> ** END OF SECTION ** <br /> Work Change Directive Form <br /> 00948-1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid <br /> DocumentsWlaster Contract Documents\Master Contract Documents\00948-Work Change Directive Rev 06-2013.doc <br />