My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Handle all materials to prevent damage. Place all materials on pallets and fully protect <br /> from moisture. <br /> C. Membrane rolls shall be stored lying down on pallets and fully protected from the weather <br /> with clean canvas tarpaulins. Unvented polyethylene tarpaulins are not accepted due to the <br /> accumulation of moisture beneath the tarpaulin in certain weather conditions that may <br /> affect the ease of membrane weldability. <br /> D. All adhesives shall be stored at temperatures approved for the product. <br /> E. All flammable materials shall be stored in a cool, dry area away from sparks and open <br /> flames. Follow precautions outlined on containers or supplied by material manufacturer/ <br /> supplier. <br /> F. All materials which are determined to be damaged by the Engineer or membrane <br /> manufacturer are to be removed from the job site and replaced at no cost to the Owner. <br /> 1.06 PROJECT CONDITIONS <br /> A. Roofing shall not be applied during precipitation. Contractor assumes all responsibility for <br /> starting installation in the event there is a probability of precipitation occurring during <br /> application. <br /> B. Only as much of the new roofing as can be made weathertight each day, including all <br /> flashing and detail work, shall be installed. All seams shall be cleaned and heat welded <br /> before leaving the job site that day. <br /> C. All work shall be scheduled and executed without exposing the interior building areas to <br /> the effects of inclement weather. The existing building and its contents shall be protected <br /> against all risks. <br /> D. All surfaces to receive new insulation,membrane or flashings shall be dry. Should surface <br /> moisture occur, the Applicator shall provide the necessary equipment to dry the surface <br /> prior to application. <br /> E. All new and temporary construction,including equipment and accessories,shall be secured <br /> in such a manner as to preclude wind blow-off and subsequent roof or equipment damage. <br /> F. Uninterrupted waterstops shall be installed at the end of each day's work and shall be <br /> completely removed before proceeding with the next day's work. Waterstops shall not emit <br /> dangerous or unsafe fumes and shall not remain in contact with the finished roof as the <br /> installation progresses. Contaminated membrane shall be replaced at no cost to the Owner. <br /> G. Arrange work sequence to avoid use of newly constructed roofing as a walking surface or <br /> for equipment movement and storage. Where such access is absolutely required, the <br /> Applicator shall provide all necessary protection and barriers to segregate the work area <br /> and to prevent damage to adjacent areas. A protection layer of plywood over insulation <br /> board shall be provided for all new and existing roof areas that receive rooftop traffic <br /> during construction. <br /> H. Prior to and during application, all dirt, debris and dust shall be removed from surfaces, <br /> either by vacuuming, sweeping,blowing with compressed air and/or similar methods. <br /> I. Contaminants, such as grease, fats, oils, and solvents, shall not be allowed to come into <br /> contact with the roofing membrane. All rooftop contamination that is anticipated or that is <br /> occurring shall be reported to the Engineer and membrane manufacturer to determine the <br /> Sebastian Corners Roof Replacement 07 54 00-2 Thermoplastic Single Ply Roofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.