Laserfiche WebLink
SECTION 01630 <br /> SUBSTITUTIONS <br /> c. Samples, if appropriate. <br /> d. Name and address of similar projects on which product was used, <br /> and date of installation. <br /> 2. For construction methods (if specified): <br /> a. Detailed description of proposed method. <br /> b. Drawings illustrating method. <br /> 3. Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product, manufacturer or method <br /> specified. <br /> C. In making Request for Substitution, CONTRACTOR represents that: <br /> 1. CONTRACTOR has investigated proposed substitution, and determined <br /> that it is equal to or superior in all respects to the product, manufacturer or <br /> method specified. <br /> 2. CONTRACTOR will provide the same or better guarantees or warranties <br /> for proposed substitution as for product, manufacturer, or method <br /> specified. <br /> 3. CONTRACTOR waives all claims for additional costs or extension of time <br /> related to a proposed substitution that subsequently may become <br /> apparent. <br /> D. A proposed substitution will not be accepted if: <br /> 1. Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents. <br /> 2. It will delay completion of the Work, or the work of other contractors. <br /> 3. It is indicated or implied on a Shop Drawing and is not accompanied by a <br /> formal Request for Substitution from CONTRACTOR. <br /> E. If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified, furnish the product, manufacturer, or method specified at no additional <br /> cost to OWNER. <br /> F. Approval of a substitution will not relieve CONTRACTOR from the requirement for <br /> submission of Shop Drawings as set forth in the Contract Documents. <br /> G. The procedure for review by Engineer will include the following: <br /> 1. Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR. <br /> 2. Upon receipt of an application for review of a substitution, Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item. <br /> 3. If the substitution will not require a more extensive review, Engineer will <br /> proceed with the review without additional cost to CONTRACTOR. <br /> 01630-2 01630 Substitutions <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master <br /> Contract Documents\Master Contract Documents\01630-Substitutions.doc <br />