My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-144B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-144B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 10:39:24 AM
Creation date
9/10/2018 3:47:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/14/2018
Control Number
2018-144B
Agenda Item Number
8.Y.
Entity Name
Roof Authority
Subject
Roof Replacement
Area
Sebastian Corners
Project Number
1765
Bid Number
2018062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01770 <br /> CLOSEOUT PROCEDURES <br /> k. Touch up and otherwise repair and restore marred, exposed finishes <br /> and surfaces. Replace finishes and surfaces that cannot be <br /> satisfactorily repaired or restored or that already show evidence of <br /> repair or restoration. <br /> 1) Do not paint over "UL" and similar labels, including mechanical <br /> and electrical nameplates. <br /> I. Wipe surfaces of mechanical and electrical equipment, elevator <br /> equipment, and similar equipment. Remove excess lubrication, paint <br /> and mortar droppings, and other foreign substances. <br /> m. Replace parts subject to unusual operating conditions. <br /> n. Clean plumbing fixtures to a sanitary condition,free of stains, including <br /> stains resulting from water exposure. <br /> o. Replace disposable air filters and clean permanent air filters. Clean <br /> exposed surfaces of diffusers, registers, and grills. <br /> p. Clean ducts, blowers, and coils if units were operated without filters <br /> during construction. <br /> q. Clean light fixtures, lamps, globes, and reflectors to function with full <br /> efficiency. Replace burned-out bulbs, and those noticeably dimmed by <br /> . hours of use, and defective and noisy starters in fluorescent and <br /> mercury vapor fixtures to comply with requirements for new fixtures. <br /> r. Leave Project clean and ready for occupancy. <br /> C. Pest Control: Engage an experienced, licensed exterminator to make a final <br /> inspection and rid Project of rodents, insects, and other pests. Prepare a report. <br /> D. Comply with safety standards for cleaning. Do not burn waste materials. Do not <br /> bury debris or excess materials on Owner's property. Do not discharge volatile, <br /> harmful, or dangerous materials into drainage systems. Remove waste materials <br /> from Project site and dispose of lawfully. <br /> END OF SECTION <br /> 01770 Closeout Procedures <br /> 01770-5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01770-Closeout Procedures.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.