Laserfiche WebLink
SECTION 01770 <br /> CLOSEOUT PROCEDURES <br /> k. Touch up and otherwise repair and restore marred, exposed finishes <br /> and surfaces. Replace finishes and surfaces that cannot be <br /> satisfactorily repaired or restored or that already show evidence of <br /> repair or restoration. <br /> 1) Do not paint over "UL" and similar labels, including mechanical <br /> and electrical nameplates. <br /> I. Wipe surfaces of mechanical and electrical equipment, elevator <br /> equipment, and similar equipment. Remove excess lubrication, paint <br /> and mortar droppings, and other foreign substances. <br /> m. Replace parts subject to unusual operating conditions. <br /> n. Clean plumbing fixtures to a sanitary condition,free of stains, including <br /> stains resulting from water exposure. <br /> o. Replace disposable air filters and clean permanent air filters. Clean <br /> exposed surfaces of diffusers, registers, and grills. <br /> p. Clean ducts, blowers, and coils if units were operated without filters <br /> during construction. <br /> q. Clean light fixtures, lamps, globes, and reflectors to function with full <br /> efficiency. Replace burned-out bulbs, and those noticeably dimmed by <br /> . hours of use, and defective and noisy starters in fluorescent and <br /> mercury vapor fixtures to comply with requirements for new fixtures. <br /> r. Leave Project clean and ready for occupancy. <br /> C. Pest Control: Engage an experienced, licensed exterminator to make a final <br /> inspection and rid Project of rodents, insects, and other pests. Prepare a report. <br /> D. Comply with safety standards for cleaning. Do not burn waste materials. Do not <br /> bury debris or excess materials on Owner's property. Do not discharge volatile, <br /> harmful, or dangerous materials into drainage systems. Remove waste materials <br /> from Project site and dispose of lawfully. <br /> END OF SECTION <br /> 01770 Closeout Procedures <br /> 01770-5 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1765 Sebastian Corners Roof Replacement\1-Admin\Bid Documents\Master Contract <br /> Documents\Master Contract Documents\01770-Closeout Procedures.doc <br />