Laserfiche WebLink
SECTION 00 63 25 <br /> SUBSTITUTION REQUEST FORM <br /> Project <br /> Date: Bid Opening Date: <br /> Product and/or Fabrication Method: <br /> Specification Section: <br /> Related Drawings: <br /> Criteria or Specified Product Included <br /> Product Data <br /> Fabrication Drawings <br /> Samples Where Applicable <br /> List of changes or Modifications Needed <br /> to Work as Noted in Spec <br /> Criteria or Specified Product Included <br /> Product Data <br /> Fabrication Drawings <br /> Samples Where Applicable <br /> List of changes or Modifications Needed <br /> to Work as Noted in Spec <br /> The substitution proposed is equal-to or better in every respect to that required by the Contract Documents, <br /> and it will perform equal or superior to product specified in the application indicated. The Contractor <br /> waives right to additional payment or time, that may subsequently become necessary because of the failure <br /> of the substitution to perform adequately. <br /> Signed: <br /> END OF SECTION 00 63 25 <br /> Sebastian Corners Roof Replacement 00 63 25-1 Substitution Request Form <br />