Laserfiche WebLink
SECTION 01 1100 <br /> SUMMARY OF WORK <br /> PART 1 GENERAL <br /> 1.01 WORK COVERED BY CONTRACT DOCUMENTS <br /> A. Project Name: Sebastian Corners Roof Replacement <br /> B. Project Address: 1919 Highway 1, Sebastian,Florida 32958 <br /> C. Owner: Indian River County <br /> D. Engineer: The Contract Documents, dated May 29, 2018, were prepared by REI <br /> Engineers. <br /> E. This work includes the provision of all labor, material, equipment, supervision and <br /> administration to integrate the work outlined in this project manual into the total building <br /> system such that no moisture leakage into the system occurs. In general, the scope of <br /> work in the Base Bid will include: <br /> 1. Roof Replacement — Sectors A & B (Approximately 17,860 square feet): <br /> Remove and dispose of the existing roof system including flashings and sheet <br /> metal down to the existing structural deck; resecure the structural deck to <br /> structural framing members;resecure the existing edge nailers to remain in place; <br /> loose lay insulation; mechanically attach gypsum overlayment; mechanically <br /> attach thermoplastic single ply membrane along with flashings and accessories <br /> and provide sheet metal flashings and trim to provide a complete, watertight,20- <br /> year warrantable roof assembly. <br /> 2. Screen Wall— Sector A (Approximately 223 linear feet): Provide new screen <br /> wall with gate door along with flashings and accessories and provide sheet metal <br /> flashings and trim to provide a 20-year warrantable wall panel assembly. <br /> F. The contractor is responsible for all electrical, plumbing, mechanical, and other related <br /> trade work necessary to facilitate project operations. Contractor is responsible for re- <br /> locating any and all conduit, HVAC equipment, curbs, and/or plumbing necessary to <br /> comply with the requirements of these documents. All work shall conform to the <br /> requirements of the current Building Code approved in the State of the project location. <br /> G. General requirements and specific recommendations of the material manufacturers are <br /> included as part of these specifications. The manufacturers' specifications are the <br /> minimum standards required for the completed systems. Specific items listed herein may <br /> improve the standards required by the manufacturers and will take precedence where <br /> their compliance will not affect the manufacturers' guarantee or warranty provisions. <br /> 1.02 CONTRACT <br /> A. Project will be constructed under a single prime general construction contract. <br /> 1.03 SITE INVESTIGATION <br /> A. The Contractor acknowledges that he has satisfied himself as to the nature and location of <br /> Sebastian Corners Roof Replacement 01 11 00-1 Summary of Work <br />