My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-149AA
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-149AA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 10:49:39 AM
Creation date
9/18/2018 1:17:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Proposal
Approved Date
08/14/2018
Control Number
2018-149AA
Agenda Item Number
12.G.1.
Entity Name
Parkson Corporation
Subject
Aqua Guard Continuous Self Cleaning Bar Filter Screen
Area
South County Waste Water Treatment Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUOTATION NO. 802011086 Rev 3, Page 5 <br />BUYER / OWNER RESPONSIBILITY UNLESS OTHERWISE STATED: <br />Getting the Unit ready for the Rebuild/Retrofit <br />• Upon disassembly on-site, if any unforeseen parts or structural repairs are discovered, <br />Parkson Corporation will notify the customer prior to commencement of any repairs which will <br />be beyond the originally quoted scope. The costs for these items and any time extension will be <br />added to the scope of work. <br />• Removal and installation of Aqua Guard unit in channel, does not include the following: <br />1. Disassembling from adjoining equipment / electrical / controls. <br />2. Disconnecting shower water connections and water supply. <br />3. Disconnecting controls / electrical connection and interconnecting wiring removal <br />(including any of the following, but not limited to: E -stop button, solenoids, motors, <br />interlock switches, wiring and conduit from each unit -mounted electrical device to a <br />terminal box or control panel). <br />4. Removing piping connections, platforms, gratings and railings unless stated otherwise. <br />5. Removing any other auxiliary equipment or service not detailed above. <br />• Readiness of the equipment before requesting [rebuild or start-up] service. Non -readiness <br />may result in additional charges. <br />Getting the Site ready for the Rebuild/Retrofit (Personnel Safety is of utmost importance) <br />• Provide a safe work area around the equipment. <br />• Redirect channel flow. <br />• Provide clean, dry channel. <br />Customer must Provide <br />• Dumpster for all old parts. <br />Revised on: 06-09-2017 AF -010 Rev 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.