My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-167
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:02:15 AM
Creation date
9/19/2018 11:43:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/11/2018
Control Number
2018-167
Agenda Item Number
8.R.
Entity Name
Andersen Andre Consulting Engineers, Inc.
Subject
Work Order Nomber 3
Annual Professional Geotechnical Engineering Services Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />Geotechnical Engineering <br />Construction Materials Testing <br />Environmental Consulting <br />Indian River County Engineering Department <br />1801 27`h Street, Building `A' <br />Vero Beach, Florida 32960 <br />Attention: Mr. William Johnson, P.E. <br />Roadway Production Engineer <br />Subject: PROPOSAL FOR CONSTRUCTION MATERIALS TESTING <br />CR 512 RESURFACING AND SHOULDER WIDENING <br />FROM MYRTLE STREET TO 1257" AVENUE <br />IRC PROJECT No. 1305 <br />FELLSMERE, INDIAN RIVER COUNTY, FLORIDA <br />Dear Mr. Johnson: <br />EXHIBIT A <br />AACE Proposal No. P18-1117 <br />August 21, 2018 <br />Revised August 23, 2018 <br />Andersen Andre Consulting Engineers, Inc. (AACE) is pleased to present this proposal for construction <br />materials testing services during the resurfacing of portions of CR512, as indicated above. The purpose of <br />our services, as discussed further herein, will be to provide materials testing in general accordance with the <br />project plans and technical specifications. <br />BACKGROUND INFORMATION <br />Based on our cursory review of the Contract Plans prepared for the project by Atkins North America, Inc. <br />dated November 2017, we understand that the proposed improvements to CR512 consist of milling and <br />resurfacing both east and west lanes of CR 512, from Myrtle Street to 125' Avenue. Additionally, a 8 -foot <br />wide stabilized shoulder will be constructed between STA 1159 and STA 1176, after which 8 -foot wide <br />shoulders will be constructed outside of both travel lanes to the project terminus at STA 1245+20. <br />Intersections at Cypress Street and Broadway Street will be signalized, each with two (2) strain poles and span <br />wires, and four (4) mast -arm signals will be constructed at Willow Street. Approximately 16 side streets that <br />intersect CR 512 will result in turnout construction and extending the paved sections. Incidental drainage, <br />sidewalk and curb -and -gutter construction is also depicted in the plans. A project duration of 180 days has <br />been established by Indian River County (150 days to substantial completion). <br />- Balance of page intentionally left blank - <br />834 SW Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.