Laserfiche WebLink
ORDINANCE 2018- X19 <br />a. A master lot drainage plan for all single-family lots showing at a minimum <br />finish lot grades at four (4) lot corners and two (2) side lot line mid -point <br />locations, and showing finish floor elevation for the house pad and elevation of <br />typical adjacent accessory structures such as lanai, patio, and pool. <br />4. Construction details showing compliance with county standards or alternate design <br />as approved by the county public works director; <br />Special profile sheets, if necessary, showing special or unique situations; <br />6. Benchmark location, based on North American Vertical Datum 1988 (NAVD88); <br />7. Soil analysis, showing the locations and results of test borings of the subsurface <br />condition of the tract to be developed, when required by the public works director. <br />Soil conservation service information may be used when available. Where <br />impervious soils or muck are encountered, the plans shall reflect a satisfactory design <br />to cope with such conditions; <br />The plans shall contain the special conditions and specifications pertaining to the <br />subdivision in note form on the plans, such as: <br />a. Required compliance to the subdivision requirements; <br />b. Where applicable, required compliance with state standards as currently adopted <br />and in use; <br />c. Minimum standards for materials; <br />d. Test requirements for stabilization, base and backfill; <br />e. Source of water and sewer services; <br />f. Traffic -control devices and pavement markings. <br />9. The plan and profile of each proposed street and improvement to existing streets such <br />as deceleration or turn lanes (indicating the existing ground surfaces and proposed <br />street grade surfaces including extensions for a distance of fifty (50) feet beyond the <br />tract boundary) with tentative finished grades indicated, and lot grading plan and <br />including easement work, clearing and grubbing, and structural details of facilities in <br />right-of-way; <br />10. A typical cross-section of each type of proposed street or bikeway, showing the width <br />of pavement, the location and width of sidewalks, where required, and right-of-way; <br />11. Proposed erosion control facilities and the limits of earthwork construction, both as <br />to final construction and for protection during construction; <br />12. Plans for street lighting landscaping, parks, recreational areas and parking area. The <br />plans shall have applicable approvals of all governmental agencies which are <br />affected by the construction and have jurisdiction; <br />13. Projects engineered by more than one firm shall be coordinated by a single <br />engineering firm or an engineer of record appointed by the developer; <br />14. A certificate from a surveyor registered in the State of Florida that a permanent or <br />temporary reference marker has been located in the public right-of-way at a corner <br />Bold Underline: Additions to Ordinance <br />Strike through- Deleted Text from Existing Ordinance <br />FA <br />