Laserfiche WebLink
Subsurface Utilitv Enaineerina Services <br />Designating Services <br />Regular Rate <br />Emergency/On Call Services <br />1 Test Hole/Asphalt/Concrete <br />$611.00 <br />Niaht/Weekend/Overtime <br />Project Manager <br />$139.00 / per hour <br />$208.50 <br />Senior Technician <br />$103.00 / per hour <br />$154.50 <br />2 Man SUE crew <br />$198.00 / per hour <br />$297.00 <br />3 Man SUE crew <br />$251.00 / per hour <br />$376.50 <br />Vacuum Excavation <br />Test Holes <br />1 Test Hole/Dirt <br />$492.00 <br />$738.00 <br />1 Test Hole/Asphalt/Concrete <br />$611.00 <br />$916.50 <br />2 -19 Test Holes/Dirt <br />$421.00 / each <br />$631.50 <br />2 -19 Test Holes/Asphalt/Concrete <br />$480.00 / each <br />$720.00 <br />20 - 49 Test Holes/dirt <br />$385.00 / each <br />$577.50 <br />20 - 49 Test Holes/asphalt/concrete <br />$433.00 / each <br />$649.50 <br />50 - 99 Test Holes/dirt <br />$332.00 / each <br />$498.00 <br />50 - 99 Test Holes/asphalt/concrete <br />$385.00 / each <br />$577.50 <br />103 or more Test Holes/dirt <br />$295.00 / each <br />$442.50 <br />103 or more Test Holes/asphalt/concrete <br />$336.00 / each <br />$504.00 <br />GPR Bore Route <br />$599.00 / each <br />$898.50 <br />Vacuum Excavation for Environmental Services <br />Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand digging down 8 feet to 10 feet prior <br />to drilling. (3"-4" in diameter, 8' to 10' deep, concrete/asphalt removed if necessary) <br />1 -9 Monitoring Wells/Soil Samples $301.00 / each $451.50 <br />10 - 19 Monitoring Wells/Soil Samples $242.00 / each $363.00 <br />20 - 49 Monitoring Wells/Soil Samples $182.00 / each $273.00 <br />An hourly rate of $343.00 will be used for all exploratory excavation projects. $514.50 <br />Larger excavation projects which require specialized equipment (shoring, de -watering, etc.) will be quoted on a task by task basis. <br />Overtime rates will be charged for jobs requiring night work or Emergency/On-Call Services <br />Survey Services for Utility Projects <br />Project Manager/Professional Surveyor and Mapper $139.00 / per hour $208.50 <br />Two Person Survey Field Team $139.00 / per hour $208.50 <br />Three Person Survey Field Team $175.00 / per hour $262.50 <br />Clerical $ 62.00 / per hour <br />Concrete Radar Mapping/Imaging <br />(concrete assessment/inspection, grid scans & debris assessment) <br />1 Man Crew $217.00 / per hour $336.00 <br />Closed Circuit Televising (CCN) Services (will be quoted on a task by task basis per requirements) <br />Maintenance of Traffic (MOT) <br />If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of same <br />Per Lane (Daytime) $731.00 / per day <br />Per Lane (Nighttime) $931.00 / per night <br />Sidewalk Closures $200.00 / each <br />Mobilization <br />Per Project in Excess of 50 Miles from Home Office $900.00 $1,350.00 <br />Location <br />Per Diem/Lodging Expenses <br />Per Day Two Person Crew $319.00 <br />Per Day Three Person Crew $438.00 <br />If HAZWOPER CERTIFIED personnel are required there will be a 20% increase in the Hourly Rate. <br />Elevation Certificates <br />Residential Elevation Certificate <br />Commercial Elevation Certificate (per bldg.) <br />Mortgaa Survey <br />i.. -:5 - L <br />Gary B. Krick, PSM I President <br />$478.00 <br />$903.00 <br />quoted on a task by task basis per requirements <br />August 27, 2018 <br />