Laserfiche WebLink
EXHIBIT "D" <br />Task <br />*1 <br />Value <br />IRC to pay GRBK GHO Arabella Reserve, LLC for 58th Ave Right -of -Way Dedication <br />$ <br />28,000.00 <br />IRC to pay GRBK GHO Arabella Reserve, LLC for drainage improvements <br />$ <br />76,230.78 <br />IRC to pay GRBK GHO Arabella Reserve, LLC for engineering and surveying <br />$ <br />10,000.00 <br />Subtotal from IRC <br />$ 114,230.78 <br />EA <br />$ 250.00 <br />$ 1,000.00 <br />GRBK GHO Arabella Reserve, LLC to pay IRC fair share cost for Intersection <br />Improvements of 49th ST and 58th AVE. <br />$ <br />13,022.00 <br />GRBK GHO Arabella Reserve, LLC to pay IRC for sidewalk <br />$ <br />17,982.00 <br />Subtotal from GRBK GHO Arabella Reserve, LLC <br />$ <br />31,004.00 <br />$ 16,294.98 <br />Dewatering <br />1 <br />Total IRC to reimburse GRBK GHO Arabella Reserve, LLC at C of Cl$ <br />83,226.78 <br />DRAINAGE IMPROVEMENTS <br />*1 <br />Construction layout and asbuilt <br />1 <br />LS <br />$ 7,200.00 <br />Erosion control silt fence <br />1000 <br />LF <br />$ 3.00 <br />$ 3,000.00 <br />Erosion control basin protection <br />4 <br />EA <br />$ 250.00 <br />$ 1,000.00 <br />Clearing <br />1.5 <br />AC <br />$ 4,920.00 <br />$ 7,380.00 <br />Excavation <br />9642 <br />BCY <br />$ 1.69 <br />$ 16,294.98 <br />Dewatering <br />1 <br />LS <br />$ 3,459.00 <br />24" RCP / CMP <br />90 <br />LF <br />$ 76.92 <br />$ 6,922.80 <br />Outfall structure <br />1 <br />EA <br />$ 6,894.00 <br />$ 6,894.00 <br />Stabilize each side of canal bank (rock <br />rip -rap) <br />1 <br />LS <br />$ 13,850.00 <br />Sodding <br />33000 <br />SF <br />$ 0.31 <br />$ 10,230.00 <br />TOTAL = <br />$ 76,230.78 <br />SIDEWALK ESTIMATE *2 <br />Sidewalk 1 3330 1 SF 1 $ 5.40 $ 17,982.00 <br />*1 <br />*2 <br />