My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-179
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2024 2:37:13 PM
Creation date
9/21/2018 12:20:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Developer's Agreement
Approved Date
09/18/2018
Control Number
2018-179
Agenda Item Number
12.F.1.
Entity Name
GRBK GHO Arabella Reserve LLC
Waterway Village
Subject
Developer's Agreement Intersection Improvements Single Fmaily Home subdivision
Area
Waterway Village 49th Street and 58th Avenue
Project Number
49th Street and
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "D" <br />Task <br />*1 <br />Value <br />IRC to pay GRBK GHO Arabella Reserve, LLC for 58th Ave Right -of -Way Dedication <br />$ <br />28,000.00 <br />IRC to pay GRBK GHO Arabella Reserve, LLC for drainage improvements <br />$ <br />76,230.78 <br />IRC to pay GRBK GHO Arabella Reserve, LLC for engineering and surveying <br />$ <br />10,000.00 <br />Subtotal from IRC <br />$ 114,230.78 <br />EA <br />$ 250.00 <br />$ 1,000.00 <br />GRBK GHO Arabella Reserve, LLC to pay IRC fair share cost for Intersection <br />Improvements of 49th ST and 58th AVE. <br />$ <br />13,022.00 <br />GRBK GHO Arabella Reserve, LLC to pay IRC for sidewalk <br />$ <br />17,982.00 <br />Subtotal from GRBK GHO Arabella Reserve, LLC <br />$ <br />31,004.00 <br />$ 16,294.98 <br />Dewatering <br />1 <br />Total IRC to reimburse GRBK GHO Arabella Reserve, LLC at C of Cl$ <br />83,226.78 <br />DRAINAGE IMPROVEMENTS <br />*1 <br />Construction layout and asbuilt <br />1 <br />LS <br />$ 7,200.00 <br />Erosion control silt fence <br />1000 <br />LF <br />$ 3.00 <br />$ 3,000.00 <br />Erosion control basin protection <br />4 <br />EA <br />$ 250.00 <br />$ 1,000.00 <br />Clearing <br />1.5 <br />AC <br />$ 4,920.00 <br />$ 7,380.00 <br />Excavation <br />9642 <br />BCY <br />$ 1.69 <br />$ 16,294.98 <br />Dewatering <br />1 <br />LS <br />$ 3,459.00 <br />24" RCP / CMP <br />90 <br />LF <br />$ 76.92 <br />$ 6,922.80 <br />Outfall structure <br />1 <br />EA <br />$ 6,894.00 <br />$ 6,894.00 <br />Stabilize each side of canal bank (rock <br />rip -rap) <br />1 <br />LS <br />$ 13,850.00 <br />Sodding <br />33000 <br />SF <br />$ 0.31 <br />$ 10,230.00 <br />TOTAL = <br />$ 76,230.78 <br />SIDEWALK ESTIMATE *2 <br />Sidewalk 1 3330 1 SF 1 $ 5.40 $ 17,982.00 <br />*1 <br />*2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.