Laserfiche WebLink
Categorical Exclusion Description <br />Type 04: Planning and administrative activities which do not involve or lead directly to construction, <br />such as: training, technical assistance and research; promulgation of rules, regulations, directives, or <br />program guidance; approval of project concepts; engineering; and operating assistance to transit <br />authorities to continue existing service or increase service to meet routine demand. <br />Date Description Date <br />Class Ilc CE Approved <br />Scope Name / Line Item FTA Total <br />Code Number Line Item Name Quantity Amount Eligible <br />Cost <br />OTHER CAPITAL EMPLOYEE <br />ITEMS (BUS) 11.7D.02 EDUCATION/TRAINING 0 $5,000.00 $5,000.00 <br />(117-00) <br />Finding: Class II(c) - Categorical Exclusions (C -List) <br />Class Level Description <br />Class II(c) consists of projects called categorical exclusions (CEs) which are known not to have, <br />either individually or cumulatively, a significant environmental impact on the human or natural <br />environment and are therefore categorically excluded from the requirement to prepare an <br />environmental assessment or an environmental impact statement. Class II(c) does not require <br />documentation. <br />Categorical Exclusion Description <br />Type 09: Assembly or construction of facilities that is consistent with existing land use and zoning <br />requirements (including floodplain regulations) and uses primarily land disturbed for transportation <br />use, such as: buildings and associated structures; bus transfer stations or intermodal centers; <br />busways and streetcar lines or other transit investments within areas of the right-of-way occupied by <br />the physical footprint of the existing facility or otherwise maintained or used for transportation <br />operations; and parking facilities. <br />Date Description Date <br />Class Ilc CE Approved <br />Scope Name / Code Line Item Line Item Name Quantity FTA Total Eligible <br />Number Amount Cost <br />Bus Associated Transit 11.92.02 PURCHASE BUS 6 $100,000.00 $100,000.00 <br />Improvements (119-00) SHELTERS <br />Finding: Class II(c) - Categorical Exclusions (C -List) <br />Class Level Description <br />Class II(c) consists of projects called categorical exclusions (CEs) which are known not to have, <br />either individually or cumulatively, a significant environmental impact on the human or natural <br />environment and are therefore categorically excluded from the requirement to prepare an <br />environmental assessment or an environmental impact statement. Class II(c) does not require <br />documentation. <br />