My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 0114 00 <br />WORK RESTRICTIONS <br />GENERAL <br />1.01 SECTION INCLUDES <br />A. Administrative and procedural requirements for work sequence, work restrictions, <br />occupancy requirements and use of premises. <br />1.02 WORK SEQUENCE <br />A. The Work shall be conducted in the following sequences unless construction phases are <br />otherwise specified. <br />1. Construct Work in phases to accommodate the Owner's use; if applicable, of the <br />premises during the construction period; coordinate the construction schedule <br />and operations with the Owner and Engineer. <br />2. Construct the Work in phases to provide for public convenience. Do not close <br />off public use of facility until completion of one phase of construction will <br />provide alternative usage. <br />3. Construction shall be scheduled in such a manner that once work has commenced <br />on one facility, the Contractor's work force shall remain at that facility <br />continuously each work day through final completion at that facility. <br />1.03 OCCUPANCY REQUIREMENTS <br />A. Owner Occupancy <br />1. Owner will occupy the premises during the entire period of construction to <br />conduct normal operations. Cooperate with Owner in all construction operations <br />to minimize conflict, and to facilitate Owner usage. <br />2. Contractor shall at all times conduct his operations as to ensure the least <br />inconvenience and the greatest amount of safety and security for the Owner, his <br />staff, and the general public. <br />3. Control noise from operations so that building occupants are not affected. <br />4. Control odors from air intakes so that building occupants are not affected. <br />1.04 USE OF PREMISES <br />A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of <br />site beyond areas in which the Work is indicated. <br />1. Limits: Confine constructions operations to areas of work being renovated as <br />approved by Engineer and Owner. <br />2. Driveways and Entrances: Keep driveways and entrances serving premises clear <br />and available to Owner, Owner's employees, and emergency vehicles at all times. <br />Do not use these areas for parking or storage of materials. <br />a. Schedule deliveries to minimize use of driveways and entrances. <br />b. Schedule deliveries to minimize space and time requirements for storage <br />of materials and equipment on-site. <br />Move any stored materials and equipment that interfere with operations of the <br />Owner. <br />Indian River County West WWTP <br />Roof Replacement 01 14 00-1 Work Restrictions <br />
The URL can be used to link to this page
Your browser does not support the video tag.