My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r—� <br />scl <br />SOUTNERNCOATINGSINC <br />ROOFING <br />SCI <br />S 0 U T H E R N C 0 A T I N G S I N C <br />Project Name: <br />Bayview Club Building 110 —Naval Station <br />Location: <br />Guantanamo Bay;, Cuba <br />Owner: <br />U.S. Navy <br />Contractor: <br />Subcontractor <br />Year Completed: <br />Project Manager: <br />Superintendant: <br />Contract Amount: <br />Contact: <br />2017 <br />Eliseo Cruz <br />Mark Biederman <br />$229,375.00 <br />Paul Ratcliff <br />(904) 276-2291 <br />rcijaxfa:�aol:com <br />Scope: This is project consisted of installing a standing seam metal roof for the <br />U.S. Navy at Guantanamo Bay, Cuba. <br />Challenges &.Resolutions: <br />The job location was performed in a highly restricted area in a foreign country. It <br />was difficult for the employees to obtain security clearance in a timely manner and <br />along with having to undergo very warm temperatures during the day..Employees <br />were also away from their families for weeks at a time. SCI also had to have <br />material shipped far in advance from Jacksonville and. Virginia down to Cuba <br />which was also an added expense because there were no local hardware stores on <br />the island. SCI resolved some of the challenges by practicing proper scheduling in <br />advance to stay on schedule. <br />Confidential and Proprietary Information Of Southern Coatings, Inc. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.