My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:17:59 AM
Creation date
10/15/2018 4:45:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168B
Agenda Item Number
8.X.
Entity Name
Timothy Rose Contracting
Subject
Atlantic Boulevard Parking Area
Area
Atlantic Boulevard and 43rd Avenue
Project Number
IRC-1719
Bid Number
2018070
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. <br />DATE OF ISSUANCE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: ATLANTIC BOULEVARD PARKING AREA <br />OWNER's Project No. IRC -1719 <br />EFFECTIVE DATE: <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following .methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />a Unit Prices <br />[1 Lump Sum <br />n Other: <br />n By Change Order: <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />n Engineer's Records <br />II Other: <br />❑ By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />* * END OF SECTION * * <br />F:\PubIicWorks\ENGINEERIN6 DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area Project\1-Admin\Bid DocumentsWlaster <br />Contract Documents\00948 - Work Change Directive Rev 06-201.3.doc <br />RECOMMENDED: <br />By: <br />APPROVED: <br />By: <br />ACCEPTED: <br />By: <br />CONTRACTOR (Signature) <br />Date: <br />ENGINEER (Signature) <br />Date: <br />OWNER (Signature) <br />Date: <br />* * END OF SECTION * * <br />F:\PubIicWorks\ENGINEERIN6 DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area Project\1-Admin\Bid DocumentsWlaster <br />Contract Documents\00948 - Work Change Directive Rev 06-201.3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.