My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:17:59 AM
Creation date
10/15/2018 4:45:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168B
Agenda Item Number
8.X.
Entity Name
Timothy Rose Contracting
Subject
Atlantic Boulevard Parking Area
Area
Atlantic Boulevard and 43rd Avenue
Project Number
IRC-1719
Bid Number
2018070
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Inspect each pollution control system at least once per day and after each rainfall <br />event. Clean and maintain each pollution control system as required until the <br />system is no longer needed. If a water quality violation occurs, immediately cease <br />all work contributing to the water quality violation and correct the problem. <br />Immediately report all water quality violations to the OWNER. Immediately report <br />the discharge of any hazardous substance to the State Warning Point at 800-320- <br />0519 or 850-413-9911. <br />E. Discharge shall not violate State or local water quality standards in receiving waters, <br />nor cause injury to the public health or to public or private property, nor to the Work <br />completed or in progress. The receiving point for water from construction <br />operations shall be approved by the applicable owner, regulatory agency, and the <br />ENGINEER. The receiving point shall be shown on the Project SWPPP. <br />F. Promptly repair all damage at no cost to the OWNER. <br />1.4 SUBMITTALS <br />A. Shop Drawings: Submit shop drawings of the proposed pollution control and <br />treatment systems in accordance with Section 1340. <br />B. Approved Stormwater Pollution Prevention Plan. <br />C. "Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering <br />Water and Stormwater From Construction Activities" <br />1.5 STORMWATER TREATMENT AND EROSION CONTROL SYSTEM <br />RESPONSIBILITY <br />A. Prepare a site-specific design of the erosion and stormwater pollution control <br />system. Install and maintain all erosion and stormwater pollution control devices <br />under the supervision of a State Certified Stormwater, Erosion, and Sedimentation <br />Control Inspector. Maintain the erosion and stormwater pollution control devices <br />until in the ENGINEER's sole opinion, the devices are no longer necessary (such <br />time not to extend past the date the OWNER formally accepts the project as <br />complete). Before beginning construction, submit to Indian River County, Florida <br />Department of Environmental Protection (FDEP) and other applicable regulatory <br />agencies for review and approval, a Stormwater Pollution Prevention Plan <br />(SWPPP), prepared by the certified erosion control subcontractor. Construction <br />shall not begin until the SWPPP has been approved by Indian River County, FDEP, <br />and all applicable regulatory agencies. Submit the approved SWPPP to the <br />ENGINEER before beginning construction. Include in the SWPPP, the <br />"Contractor's Affidavit Regarding Erosion Control and Treatment of Dewatering <br />Water and Stormwater From Construction Activities" (located at the end of this <br />Section). <br />01025-6 . Technical Specifications <br />F:\PubIicWorks\ENGINEERING DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area Project\1-Admin\Bid DocumentsWlaster <br />Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.