My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:17:59 AM
Creation date
10/15/2018 4:45:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168B
Agenda Item Number
8.X.
Entity Name
Timothy Rose Contracting
Subject
Atlantic Boulevard Parking Area
Area
Atlantic Boulevard and 43rd Avenue
Project Number
IRC-1719
Bid Number
2018070
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be replaced within two weeks. <br />D. Fertilizer: Commercial fertilizers shall comply with the Indian River County Fertilizer <br />Ordinance 2013-012 and Supplement Ordinance 2013-014 (see Appendix B). <br />E. Water for Grassing: Contractor shall provide the water used in the sodding <br />operations as necessary to meet the requirements of Article 570-3.6. <br />F. Preparation of Ground: The area over which the sod is to be placed shall be <br />scarified or loosened to a depth and then raked smooth and free from debris. <br />Where the soil is sufficiently loose and clean, the Owner, at his discretion, may <br />authorize the elimination of ground preparation. <br />G. Application of Fertilizer: Before applying fertilizer, the soil pH shall be brought to a <br />range of 6.0-7.0. <br />Contractor shall apply two (2) applications. The initial shall be fertilizer and the <br />second application shall be "weed and feed". <br />The fertilizer shall be spread uniformly over the sodded area at the rate of 436 <br />pounds per acre, or 10 pounds per 1,000 square feet, by a spreading device <br />capable of uniformly distributing the material at the specified rate. <br />Contractor shall apply applications as per manufacturer's specification. All tickets <br />from bags shall be handed over to the County Inspector. <br />On steep slopes, where the use of a machine for spreading or mixing is not <br />practicable, the fertilizer shall be spread by hand and raked in and thoroughly mixed <br />with the soil to a depth of approximately 2 inches. <br />H. Placing Sod: The sod shall be placed on the prepared surface, with edges in close <br />contact and shall be firmly and smoothly embedded by light tamping with <br />appropriate tools. <br />Where sodding is used in drainage ditches, the setting of the pieces shall be <br />staggered so as to avoid a continuous seam along the line of flow. Along the edges <br />of such staggered areas, the offsets of individual strips shall not exceed 6 inches. In <br />order to prevent erosion caused by vertical edges at the outer limits, the outer <br />pieces of sod shall be tamped so as to produce a featheredge effect. <br />Where sodding is placed abutting paved shoulder, the contractor is to ensure that <br />the finished sod elevation is 1 Y2' below paved shoulder. <br />On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by <br />means of wooden pegs driven through the sod blocks into firm earth, at suitable <br />intervals. <br />Sodding shall not be performed when weather. and soil conditions are, in the <br />Engineer's opinion, unsuitable for proper results. <br />Sod shall be placed around all.structures, equipment, pads, etc. <br />I. Watering: The areas on which the sod is to be placed shall contain sufficient <br />moisture, as determined by the Engineer, for optimum results. After being placed, <br />the sod shall be kept in a moist condition to the full depth of the rooting zone for at <br />least 2 weeks. Thereafter, the Contractor shall apply water as. needed until the sod <br />roots . and starts to grow for a minimum of 60 days (or until final acceptance, <br />whichever is latest). <br />01025-19 Technical Specifications <br />R\Public Works\ENGINEERING, DIVISION PROJECTS\1719 Atlantic Blvd Parkng.Area Project\1-Admin\Bid Documents* <br />Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.