My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:17:59 AM
Creation date
10/15/2018 4:45:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168B
Agenda Item Number
8.X.
Entity Name
Timothy Rose Contracting
Subject
Atlantic Boulevard Parking Area
Area
Atlantic Boulevard and 43rd Avenue
Project Number
IRC-1719
Bid Number
2018070
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION — 999 - Record/As-Builts <br />GENERAL <br />Maintain, prepare antl provide the ENGINEER with record documents as specified below, <br />except where otherwise specified or modified within the scope of work provided in the <br />specific project contract documents. The Contractor and/or Developer shall be responsible <br />for, and required to provide, Record Drawings as outlined in this section. <br />MAINTENANCE OF RECORD DOCUMENTS: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following project documents: Drawings, Specifications, <br />Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br />other modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available. at all times for inspection by ENGINEER and <br />OWNER. <br />4. Do not use record documents for any other purpose and do not remove them <br />from the field office. <br />5. Label each document "RECORD DRAWING" in 2 -inch high printed letters. <br />6. Keep record documents current at all times. <br />7. No work shall be permanently concealed until the required record data has <br />been obtained. <br />RECORD / AS -BUILT DRAWINGS <br />A. During the construction operation, the CONTRACTOR shall maintain records <br />of all deviations from the approved Project Plans and Specifications and shall <br />prepare therefrom "RECORD" drawings showing correctly and accurately all <br />changes and deviations from the work made during construction to reflect the work <br />as it was actually constructed. <br />B. The Record/As-Built survey shall be performed and subsequent plans <br />prepared by a Professional Surveyor and Mapper, registered in the state of <br />Florida and certified to the standards set forth in Chapter 472, Florida Statutes and <br />Chapter 5J-17.050 Florida Administrative Code (Florida Minimum Technical <br />Standards). <br />C. Field measurements of vertical or horizontal dimensions of constructed <br />improvements shall be obtained so that the constructed facility can be delineated in <br />such a way that the location of the construction may be compared with the <br />construction plans. Clearly shown by symbols, notations, or delineations, those <br />constructed improvements located by the survey. <br />D.. All vertical information. (elevations) . provided on the Record Drawings -shall be <br />referenced to the North American Vertical Datum of 1988 (NAVD 88) unless <br />Otherwise specified by the.Project Engineer. <br />01025-22 . Technical Specifications <br />F:\Public.works\ENGINEERING DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area Project\1=Admin\Bid Documentswaster <br />Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.