Laserfiche WebLink
COMPLETION OF WORK <br />Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings <br />to ENGINEER. Final payment will not be made until satisfactory record documents are <br />received and approved by ENGINEER. <br />AERIAL PHOTOGRAPH <br />The CONTRACTOR shall provide aerial photographs of the project every 30 days <br />during construction. The photographs shall be done in a manner to show the <br />construction progress for the entire length of the project. The photographs can be <br />angled and not prepared to a particular scale, however, must be detailed enough to <br />identify the work in detail. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 999-1 As -Built Survey (By Registered Surveyor)— Per Lump Sum <br />01025-26 Technical Specifications <br />R\Public Works\ENGINEERING DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area Project\1-Admin\13id Documents\Master <br />Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />