Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project consists of repaving and reconfiguring the parking lot at the <br />northeast corner of SR -60 and 431 Avenue, including drainage improvements, signing <br />and pavement markings, landscaping, sign relocation and removal of existing <br />monitoring wells. Additional improvements include the construction of concrete <br />sidewalks along 42nd Avenue/Atlantic Boulevard, and associated crosswalk markings. All <br />work is to be in accordance with Florida Department of Transportation, City of Vero <br />Beach and Indian River County requirements. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: ATLANTIC BOULEVARD PARKING AREA <br />County Project Number: IRC -1719 <br />Bid Number: 2018070 <br />Project Address: ATLANTIC BOULEVARD AT SR -60, 43RD AVENUE AND 42ND <br />AVENUE, VERO BEACH, FLORIDA 32960 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />00520 - Agreement (Public Works) REV 06-14.doc <br />00520-2 <br />FAPurdiasing\Bids\2017-2018 FY (2018000)\2018070 Rebid Atlantic Boulevard Parking\00520 - Agreement (Public Works) REV 06-14,doc . <br />