My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:17:59 AM
Creation date
10/15/2018 4:45:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168B
Agenda Item Number
8.X.
Entity Name
Timothy Rose Contracting
Subject
Atlantic Boulevard Parking Area
Area
Atlantic Boulevard and 43rd Avenue
Project Number
IRC-1719
Bid Number
2018070
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br />Date of Issuance: 20 <br />OWNER: Indian River County <br />CONTRACTOR - <br />CONTRACT FOR: ATLANTIC BOULEVARD PARKING AREA <br />Project No.: IRC -1719 <br />Project Description: The project consists of repaving and reconfiguring the parking lot at <br />the northeast corner of SR -60 and 43rd Avenue, including drainage improvements, <br />signing and pavement markings, landscaping, sign relocation and removal of existing <br />monitoring wells. Additional improvements include the construction of concrete <br />sidewalks along Ord Avenue/Atlantic Boulevard, and associated crosswalk markings. All <br />work is to be in accordance with Florida Department of Transportation, City of Vero <br />Beach and Indian River County requirements. <br />OWNER's Bid No. 2018070 <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br />to the following specified parts thereof: <br />T <br />And T <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br />substantially complete in accordance with the Contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br />inclusive, and the failure to include an item in it does not alter the responsibility of <br />CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br />items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br />days of the.above date of Substantial Completion. <br />00630 - Certificate of Substanfial Completion. REV 04-07 <br />0063Q 1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1719 Atlantic Blvd Parkng Area ProjedN-Admin\Bid Documents\Master Contract Documents\00630 -Certificate of <br />. - Substantial Completion REV 04-07.doc - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.