IRC PROJECT NO.
<br />1643
<br />Pay App 6
<br />71
<br />SCHEDULED VALUE
<br />PREVIOUS APPLICATION
<br />THIS PERIOD
<br />TOTAL COMPLETED
<br />%
<br />MATERIALS
<br />BALANCE
<br />TO FINISH
<br />Item No.
<br />MOBILIZATION
<br />1
<br />LS
<br />22,500.00
<br />22,500.00
<br />0.85
<br />19,125.00
<br />0.15
<br />3,375.00
<br />1.00
<br />22,500.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />101-1
<br />MAINTENANCE OF TRAFFIC
<br />1
<br />LS
<br />28,468.00
<br />28,468.00
<br />0.85
<br />24,197.80
<br />015
<br />4,270.20
<br />1.00
<br />28,468.00
<br />100.00%
<br />0..
<br />0.00
<br />0.00
<br />102-1
<br />TRAFFIC CONTROL OFFICER (OFF-DUTY LAW
<br />40
<br />MH
<br />69.00
<br />2,760.00
<br />0.00
<br />0.00
<br />1,380.00
<br />20.00
<br />1,380.00
<br />50.00%
<br />1 20.
<br />1,380.00
<br />102-14
<br />ENFORCEMENT)
<br />INLET PROTECTION SYSTEM (SEDIMENTATION
<br />5
<br />EA
<br />57.50
<br />287.50
<br />5.00
<br />287.50
<br />0.00
<br />5.00
<br />287.50
<br />100.00%
<br />00
<br />0.00
<br />0.00
<br />104-18
<br />CONTROL)
<br />CLEARING & GRUBBING
<br />1
<br />LS
<br />11,500.00
<br />11,500.00
<br />1.00
<br />11,500.00
<br />0.00
<br />1.00
<br />11,500.00
<br />100.00%
<br />Oxo
<br />0.00
<br />0.00
<br />110-1-1
<br />REMOVE EXISTING CONCRETE SIDEWALK
<br />106
<br />SY
<br />28.75
<br />3,047.50
<br />106.00
<br />3,047.50
<br />0.00
<br />106.00
<br />3,047.50
<br />100.00%
<br />0.00
<br />0.00
<br />110-4
<br />EMBANKMENT FILL
<br />9
<br />CY
<br />23.00
<br />207.00
<br />9.00
<br />207.00
<br />0.00
<br />9.00
<br />207.00
<br />100.00%
<br />0.00
<br />0.00
<br />120.6
<br />MILLING EXISTING ASPHALT PAVEMENT (1-1/4"AVG.
<br />2.965
<br />SY
<br />11.00
<br />32,615.00
<br />2,965.00
<br />32,615.00
<br />0.00
<br />2,965.00
<br />32,615.00
<br />100.00%
<br />0.00
<br />0.00
<br />327-701
<br />DEPTH)
<br />SUPERPAVE ASPHALTIC CONCRETE TYPE SP -9.5
<br />2,965
<br />Sy
<br />16.25
<br />48,181.25
<br />2,965.00
<br />48,1 81.25
<br />0.00
<br />2,965.00
<br />48,181.25
<br />100.00%
<br />0.00
<br />0.00
<br />134-1
<br />(TRAFFIC C) (1-114-)
<br />INLET STRUCTURE (ADJUST)
<br />I
<br />EA
<br />4,025.00
<br />4,025.00
<br />0.00
<br />0.00
<br />1.00;
<br />4,025.00
<br />1.00
<br />4,025.00
<br />100.00%
<br />0.00 j
<br />0.00
<br />0.00
<br />425-1-1555
<br />CONCRETE CURB AND GUTTER (TYPE F)
<br />is
<br />LF
<br />34.50
<br />517.50
<br />21.00
<br />724.50
<br />0.00
<br />21.00
<br />724.50
<br />140.00%
<br />-6.00
<br />-207.00
<br />520-1-10
<br />CONCRETE SIDEWALK W1 FIBER MESH (V' THICK)
<br />163
<br />BY
<br />57.50
<br />9,372.50
<br />183.00
<br />10,522.50
<br />0.00
<br />183.00
<br />10,522.50
<br />112.27%
<br />-20.00
<br />-1,150.00
<br />522,2
<br />PERFORMANCE TURF -SOD (BAHIA) (INCLUDES: TOP
<br />233
<br />SY
<br />16.25
<br />3,786.25
<br />0.00
<br />0.00
<br />3,786.25
<br />233.00
<br />3,786.25
<br />100.00%
<br />�,:'O 00
<br />0.00
<br />0.00
<br />570-1-2
<br />SOIL, FERTILIZER, AND WATERING)
<br />CONDUIT, FURNISH & INSTALL, OPEN TRENCH
<br />2.995
<br />LF
<br />9.55
<br />28,602.25
<br />2,400.00
<br />22,920.00
<br />0.00
<br />2,400.00
<br />22,920.00
<br />80.13%
<br />595.00
<br />5,682.25
<br />630-2-11
<br />CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE
<br />640
<br />LF
<br />23.00
<br />14,720.00
<br />640.00
<br />14,720.00
<br />0.00
<br />640.00
<br />14,720.00
<br />100.00%
<br />.00:-.;'
<br />0.00
<br />0.00
<br />6302-12
<br />SIGNAL CABLE, FURNISH & INSTALL
<br />1
<br />PI
<br />6.676.00
<br />6,676.00
<br />1.00
<br />6,676.00
<br />0.00
<br />1.00
<br />6,676.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />632-7-1
<br />1
<br />PULL & SPLICE BOX, FURNISH & INSTALL, 13"x24"
<br />21
<br />EA
<br />650.00
<br />13,650.00
<br />21.00
<br />13,650.00
<br />0.00
<br />21.00
<br />13,650.00
<br />100.00%
<br />:06:::
<br />0.00
<br />0.00
<br />635-2-11
<br />COVER
<br />Q
<br />PULL & SPLICE BOX, FURNISH & INSTALL, 24-46"
<br />7
<br />EA
<br />1,028.00
<br />7,196.00
<br />7.00
<br />7,196.00
<br />0.00
<br />7.00
<br />7,196.00
<br />100.00%
<br />0.00
<br />0.00
<br />0.00
<br />635-2-12
<br />COVER
<br />ELECTRICAL POWER SERVICE, F & 1, UNDERGROUND
<br />1
<br />AS
<br />2,358.00
<br />2,358.00
<br />1.00
<br />2,358.00
<br />•0.00
<br />1.00
<br />2,358.00
<br />100.00%
<br />0.00
<br />0.00
<br />6351-121
<br />(METER FURNISHED BY POWER COMPANY)
<br />SIGNALS, ELECTRICAL SERVICE WIRE
<br />500
<br />LF
<br />3.61
<br />1,805.00
<br />500.00
<br />l'gOS.00
<br />0.00
<br />500.00
<br />1,805.00
<br />100.00%
<br />0.00
<br />0.00
<br />639-2-1
<br />F -
<br />SIGNALS, ELECTRICAL SERVICE DISCONNECT, F & 1.
<br />2
<br />EA
<br />914.00
<br />1,828.()0
<br />1.00
<br />914.00
<br />0. OD
<br />1.00
<br />914.00
<br />50.00%
<br />-:IOR :�i 1.
<br />1.00
<br />914.00
<br />639 -3-11
<br />POLE MOUNT
<br />P.
<br />PRESTRESSED CONCRETE POLE, F & I TYPE P-11
<br />1
<br />EA
<br />1,699.00
<br />1,699.00
<br />1.00
<br />11699.00
<br />0.00
<br />1.00
<br />1,699.00
<br />100.00%0:000
<br />0.0
<br />0.00
<br />641-2-12
<br />SERVICE POLE
<br />ALUMINUM SIGNAL POLE, F & 1, PEDESTAL
<br />6
<br />EA
<br />1,407.00
<br />8,442.00
<br />6.00
<br />8,442.00
<br />0.00
<br />6.00
<br />8,442.00
<br />100.00%
<br />0.00
<br />0.00
<br />646-1-11
<br />LUMINAIRE FOR MAST ARM ASSEMBLY
<br />4
<br />EA
<br />1,305.00
<br />5,220.00
<br />4.00
<br />5,220.00
<br />oloo
<br />4.00
<br />5,220.01
<br />1LO00.00%
<br />0.00
<br />0.00
<br />649-20
<br />STEEL MAST ARM ASSEMBLY, F & 1, SINGLE ARM 40-
<br />2
<br />EA
<br />35,796.00
<br />71,592.00
<br />2.00
<br />71,592.00
<br />0.00
<br />200
<br />71,592.00
<br />100.00;
<br />0-00
<br />0.00
<br />649-21-3
<br />71
<br />
|