Laserfiche WebLink
OSPREY ACRES - SHALLOW MARSH - K EnvironmP tal Inc Planting Breakdown and Proposal to Complete <br />(based on Indian River County drawings dated 6/12/18) <br />8.3 Acre Area of Planting and Maintenance <br />PHASE i October 10. 2018 <br />A) Pre -Planting Exotic Control On All Berms $each--#unitS $total <br />water an area n»tsi a perimeter eke <br />1 time pre -application of herbicide 1,400.00 all berms $ 1,400.00 <br />within 30 days of berm completion <br />TOTAL FOR PHASE I $ 1,400.00 <br />PHASE II <br />A) Polvac.ylomide Application $each #units $total <br />1 application on all berms/slopes and top of berms - 77,381 SF <br />Product / material 350.00 / bag 2 $ 700.00 <br />Application to all berms <br />B) Coconut Matting Installed $each #units $total <br />all berm side slopes (perimeter, peninsula, and islands) 0.31/sf 61,557sf $ 19,082.67 <br />& overlap top Von both sides = 61,557 SF @ .31 per SF <br />tops of all berms including islands <br />TOTAL FOR PHASE II <br />0.31/sf 12,160 sf $ 3,769.60 <br />$23,552.27 <br />P_ ASE III <br />A) Perimeter Berm $each # �n tS $total <br />Dr Purple 2,390 SF submerged-pickerelweed & duck potato clusters <br />of 50 each/2" plugs / 18" OC every 200'= 747 1.00 747 $ 747.00 <br />Red <br />11,758 SF - submerged - Eleocharis, BR, 18" OC = 3,675 <br />1.00 <br />3,675 <br />$ 3,675.00 <br />Dr Blue <br />13,391 SF - s. patens / BR 2" plugs / 18" OC = 4,185 <br />1.45 <br />4,185 <br />$ 6,068.25 <br />M <br />X <br />2 <br />00 <br />C7 <br />W <br />n <br />0 <br />M <br />O <br />n <br />O <br />x <br />