My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-195
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:09:14 PM
Creation date
10/29/2018 3:58:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/23/2018
Control Number
2018-195
Agenda Item Number
8.F.
Entity Name
Kimley-Horn & Associates
Subject
South Oslo Water Plant membrane replacement and plant improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT #1 <br />Work Order Number 5 <br />South Oslo Rd Membrane Treatment Plant <br />Membrane Replacement and Process Piping Improvements <br />PROJECT UNDERSTANDING <br />The existing membranes at the Oslo Road membrane water treatment plant are more than <br />10 years old and ready for replacement. Some of the membranes have reduced salt <br />rejection and operate at higher than normal operating pressures. Replacement will <br />consist of removal and disposal of the existing elements, and installation of new <br />membrane elements. Competitive bidding of equivalent elements from membrane <br />manufacturers is recommenced since membrane technology has improved and other <br />manufacturers offer competitive membranes at equivalent performance. The work will <br />be requested through advertising by an original equipment manufacturer (OEM) who has <br />experience performing this type of work. The work will be publicly advertised for <br />bidding through Indian River County (IRC) purchasing department. <br />Due to the age of the existing membrane system and support piping systems, a condition <br />assessment will be conducted to assess reliability of the existing mechanical equipment; <br />feedwater, permeate, and concentrate piping; pipe trenches; membrane skids; small <br />piping systems; and high service pump distribution piping systems. Based on the <br />assessment, improvements will be identified and prioritized according to importance. <br />Documents will be prepared for the improvements identified in the assessment review <br />and be included with the membrane replacement specifications. <br />SCOPE OF SERVICES <br />The following scope consists of membrane replacement implementation and <br />improvements identified in the assessment review for the South Oslo Rd water treatment <br />plant. <br />Task 1— Condition Assessment — Piping & Membrane System <br />The existing membrane system is currently, operating at a reduced efficiency due to <br />membrane degradation from scaling, fouling, and apparent intrusion of sand into the <br />membranes. Consultant will evaluate the existing RO skid performance and normalized <br />data, if available, to determine degradation method and determine if additional raw water <br />quality is needed from the raw water supply wells. <br />Consultant will conduct a one -day condition assessment of the existing RO skid <br />equipment, piping, pressure vessels, manifolds, trench piping, (permeate, concentrate, <br />dump), pipe trench walls/floors/grating, feedwater pumps and piping manifold, high <br />service piping manifold, cleaning piping, and chemical system piping within the trenches. <br />C:\Users\mark.miller\Documents\IRCU\Oslo Membrane R&R\Oslo WTP Membrane Replacement 10.4.2018.docx <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.