Laserfiche WebLink
E. The COUNTY shall make provisions for the ENGINEER to enter upon public and private <br />property as required for the ENGINEER to perform his services. <br />F. The COUNTY will promptly execute all permit applications and provide application fees <br />necessary to expedite the acquisition of any local, state or federal permits made necessary by the <br />project. <br />G. The COUNTY shall provide all right-of-way maps, parcel sketches, legal descriptions, and <br />abstracts of title for each parcel necessary for the road construction. <br />H. The County shall provide all design survey services necessary to support and facilitate all <br />contemplated design and permitting activities associated with this project. <br />Establish a project wide Horizontal Control Network from Timber Ridge west along Oslo <br />Road to 20th Avenue and at the Oslo Road/43rd Avenue intersection. This Network will <br />be referenced to the City of Vero Beach Control Network. Datum will be Florida State <br />Plane Coordinate System, East Zone adjusted to the North American Datum of <br />1983/1990. All horizontal control traverses will be performed in accordance with the <br />intent of third order, Class I horizontal control, as defined by the Federal Geodetic <br />Control Committee in their "Standards and Specifications for Geodetic Control <br />Networks," dated September, 1984. <br />2. Establishment of a project wide Vertical Control Network from Timber Ridge west along <br />Oslo Road to 20th Avenue and at the Oslo Road/43rd Avenue intersection. Once again, <br />this Network will be referenced to the City's Vertical Control Network. Datum will be <br />National Geodetic Vertical Datum, 1929. This work will also consist of a series of <br />connected level loops between existing City Control Benchmarks; as well as, a series of <br />connected level loops between existing Indian River County Control Benchmarks. All <br />vertical control level loops will be performed in accordance with the intent of third order <br />vertical control, as defined by the Federal Geodetic Control Committee in their <br />"Standards and Specifications for Geodetic Control Networks," dated September, 1984. <br />3. Final output will be in the form of hard copy mylar mapping along with digital <br />AutoCAD, release 13 DWG files. All mapping will conform to the United States <br />Geological Survey's, "National Map Accuracy Standards," dated 1968. <br />4. Research and analysis of existing right of way information (to include Abstracts or Title <br />Searches), field location of existing right of way monumentation and determination of <br />the location and extent of existing right of way of Oslo Road and all side streets involved <br />(ten). <br />5. Field establishment and monumentation of survey baselines along Oslo Road and all side <br />streets involved. Baselines will be established at 100' intervals along Oslo Road and 43rd <br />Avenue and at 50' intervals along affected side streets (ten). <br />6. Acquisition of cross-sections along Oslo Road at a 100' intervals and along all affected <br />side streets at 100' interval 300' east and west of Oslo Road and at 100' intervals north <br />and south on 43rd Avenue for 1,500 feet from the intersection. Cross sections shall <br />extend across adjacent sublateral canal. <br />2 <br />