My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-190A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 11:16:25 AM
Creation date
11/7/2018 11:16:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/16/2018
Control Number
2018-190A
Agenda Item Number
8.I.
Entity Name
Guettler Brothers Construction
Subject
Victor Hart Sr. Complex Drainage Improvements
Project Number
IRC-1760
Bid Number
2019005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid No. 2019005/IRC-1760 <br /> 7. The BIDDER has allocated and included in its bid the total amount of $ 0 based <br /> on the square feet of shoring to be used for compliance with shoring safety requirements and <br /> intends to comply with said shoring requirements by instituting the following specific method(s) <br /> of compliance on this Project: hx IA <br /> The determination of the appropriate method(s) of compliance is the complete and sole <br /> responsibility of the BIDDER. Such methods will not be checked by the OWNER or ENGINEER <br /> for accuracy, completeness or any other purpose. The OWNER and ENGINEER shall have no <br /> responsibility to review or check the BIDDER's compliance with the Trench Safety Standards. <br /> 8. The BIDDER, in submitting this bid, represents that it has obtained and considered all available <br /> geotechnical information, has utilized said geotechnical information and that, based on such <br /> information and the BIDDER's own information, the BIDDER has sufficient knowledge of the <br /> Project's surface and subsurface site conditions and characteristics to assure BIDDER's <br /> compliance with the applicable Trench Safety Standards in designing the trench safety <br /> system(s) for the Project. <br /> BIDDER: Guettler Brothers ristruction, LLC <br /> By: <br /> Position or Title: Manager <br /> Date: GflIq if 8- <br /> STATE OF Florida <br /> COUNTY OF Indian River <br /> Personally appeared before me, the undersigned authority, Ben Guettler who after <br /> first being sworn by me, affixed his/her signature in the space provided above on this 19th day of <br /> September , 20 18 . <br /> Sharon M. Morris ,)77 00—x / ri . rt -7 <br /> Notary Public, State at large <br /> My Commission Expires:7/31/2022 � h SHARONM.MORRIS <br /> *p1= .„ } Commission <br /> ,�� #GG 233422 <br /> "" ` Expires July 31,2022 <br /> 'For f or Bonded T!w Budget Notary Woe <br /> Page 24 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.