a. If so is there any information regarding how this building is constructed? <br /> b. Is a concrete pad be required for the new location? <br /> Answer: Due to the minimal proposed grade changes around the two metal sheds located adjacent to the <br /> football field, relocation of the sheds by the contractor will not be required. The construction plans will <br /> include this information. <br /> Question 8: Does the County want the Bermuda sod on palates or in rolls for this project? <br /> Answer:The County has no preference for how the sod arrives onsite. <br /> Question 9: Would ADS pipe be an acceptable alternate for the proposed CAP pipe? <br /> Answer: Please provide a bid based on the materials specified in the Bid Schedule.Substitutions will only <br /> be considered after the project is awarded. <br /> Question 10:Are the 5'wide coquina rock walkways the same thickness as the parking area? <br /> Answer: The coquina walkways and parking areas are both 6"thick per the Bid Schedule.__ <br /> Question 11: Plan sheet 7 shows an area of striping removal on the existing asphalt and new <br /> thermoplastic paint. Is this a part of the work for this project? <br /> c. There is not line item for striping. <br /> d. IF the County already has a striping sub-contractor under contract for other County work, <br /> it would be more economical for that sub to stripe this area due to minimums being <br /> involved. <br /> Answer:The'removal of existing striping and restriping shown in the plans will be completed by County <br /> Traffic Operations Staff.The construction plans will include this information. <br /> Question 12: Is there an erosion control plan showing the location of silt fence and construction <br /> entrance? <br /> Answer:The Erosion Control Plan is the responsibility of the contractor. County Staff will coordinate with <br /> the Contractor on the selection of a construction entrance. <br /> Question 13:Are there any particular specification requirements for the fill to be used in the football field <br /> area? .. <br /> Answer: Fill for the football field area must be AASHTO Class A-1.The construction plans will include this <br /> information. <br /> Question 14: For bidding purposed are we to assume all of the 6' chain link fence that will be removed is <br /> in good condition and can be reused? <br /> Answer:The existing chain link fence is in good condition and suitable for reuse. <br /> Question 15: Is there a detail for the installation of the 3' high guardrail? <br /> Answer:The guardrail consists of 6'6" metal posts and 25' length sections of rail. Posts shall be set in the <br /> ground at 12.5' runs. While the County will provide the posts and rail for pickup from its Road and Bridge <br /> Division, the contractor shall provide hardware.The construction plans will include this information. <br /> Question 16: Plans state that the County is supplying the 3' high guardrail. Please provide the address for <br /> the County Road and Bridge facility? <br /> Answer:The County's Road and Bridge.Division is located at 4550 41st Street in Vero Beach, FL 32967. <br />