My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-190A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 11:16:25 AM
Creation date
11/7/2018 11:16:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/16/2018
Control Number
2018-190A
Agenda Item Number
8.I.
Entity Name
Guettler Brothers Construction
Subject
Victor Hart Sr. Complex Drainage Improvements
Project Number
IRC-1760
Bid Number
2019005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECORD/AS-BUILTS DRAWINGS FORMAT - SUBMITTAL <br /> A. ENGINEER will supply the CONTRACTOR with the electronic file of the <br /> approved construction plans for the input of the As-Built (record) information. <br /> B. CONTRACTOR shall deliver seven (7) certified sets of Record/As-Builts with <br /> Electronic Drawing files prepared in AutoCAD Civil 3D 2013 AND PDF format or <br /> in current version as agreed by the ENGINEER. <br /> C. CONTRACTOR's surveyor shall review, sign and seal As-Builts or Record <br /> drawing(s). Said drawing(s) shall clearly state type of survey, positional <br /> tolerances, adhere and be certified to by a registered Professional Surveyor and <br /> Mapper in the state of Florida, any standards set forth by Florida Statutes, <br /> Administrative code and Minimum Technical Standards for As-Built/Record <br /> surveys. <br /> D. All Record/As-Built drawings are subject to review and approval by County <br /> Surveyor. <br /> ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy and completeness of Record <br /> Drawings and Electronic As-Builts and shall bear any costs incurred in finding utilities as a <br /> result of incorrect data furnished by the CONTRACTOR. <br /> COMPLETION OF WORK <br /> Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings to <br /> ENGINEER. Final payment will not be made until satisfactory record documents are <br /> received and approved by ENGINEER. <br /> AERIAL PHOTOGRAPH <br /> The CONTRACTOR shall provide aerial photographs of the project every 30 days during <br /> construction. The photographs shall be done in a manner to show the construction <br /> progress for the entire length of the project. The photographs can be angled and not <br /> prepared to a particular scale, however, must be detailed enough to identify the work in <br /> detail. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: Bid Item No. <br /> 999 — Record Drawings/As-Builts — Per Lump Sum <br /> 01025-5 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1760 Victor Hart Sr.Complex Drainage Improvements\1-Admin\Bids\Bid <br /> Documents\IRC-1760 APPEN A 20180810.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.