My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-190A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-190A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 11:16:25 AM
Creation date
11/7/2018 11:16:18 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/16/2018
Control Number
2018-190A
Agenda Item Number
8.I.
Entity Name
Guettler Brothers Construction
Subject
Victor Hart Sr. Complex Drainage Improvements
Project Number
IRC-1760
Bid Number
2019005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"EXHIBIT A" <br /> CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 40158-5 <br /> GIFFORD YOUTH CENTER <br /> DATED: July 20, 2018 <br /> 1. All activities shall be implemented following the plans, specifications andP erformance <br /> criteria approved by this permit. Any deviations must be authorized in a permit modification <br /> in accordance with Rule 62-330.315, F.A.C. Any deviations that are not so authorized may <br /> subject thepermittee to enforcement action and revocation of the t e permit under Chapter <br /> 373, F.S. <br /> 2. A complete copy of this permit shall be kept at the work site of the permitted activity during <br /> the construction phase, and shall be available for review at the work site upon request by <br /> the District staff. The permittee shall require the contractor to review the complete permit <br /> prior to beginning construction. <br /> 3. Activities shall be conducted in a manner that does not cause or contribute to violations of <br /> state water quality standards. Performance-based erosion and sediment control best <br /> management practices shall be installed immediately prior to, and be maintained during <br /> and after construction as needed, to prevent adverse impacts to the water resources and <br /> adjacent lands. Such practices shall be in accordance with the State of Florida Erosion and <br /> Sediment Control Designer and Reviewer Manual (Florida Department of Environmental <br /> 9 P <br /> Protection and Florida Department of Transportation June 2007), and the Florida <br /> Stormwater Erosion and Sedimentation Control Inspector's Manual (Florida Department of <br /> Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, <br /> July 2008), which are both incorporated by reference in subparagraph 62-330.050(9)(b)5, <br /> F.A.C., unless a project-specific erosion and sediment control plan is approved or other <br /> water quality control measures are required as part of the permit. <br /> 4. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to <br /> the District a fully executed Form 62-330.350(1), "Construction Commencement Notice," <br /> (October 1, 2013) (http://www.flrules.org/Gateway/reference.asp?No=Ref-02505), <br /> incorporated by reference herein, indicating the expected start and completion dates. A <br /> copy of this form may be obtained from the District, as described in subsection 62- <br /> 330.010(5), F.A.C., and shall be submitted electronically or by mail to the <br /> Agency. However, for activities involving more than one acre of construction that also <br /> require a NPDES stormwater construction general permit, submittal of the Notice of Intent <br /> to Use Generic Permit for Stormwater Discharge from Large and Small Construction <br /> Activities, DEP Form 62-621.300(4)(b), shall also serve as notice of commencement of <br /> construction under this chapter and, in such a case, submittal of Form 62-330.350(1) is not <br /> required. <br /> 5. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an <br /> operating entity under Rule 62-330.310, F.A.C., the permittee is liable to comply with the <br /> plans, terms and conditions of the permit for the life of the project or activity. <br /> 6. Within 30 days after completing construction of the entire project, or any independent <br /> portion of the project, the permittee shall provide the following to the Agency, as applicable: <br /> a. For an individual, private single-family residential dwelling unit, duplex, triplex, or <br /> quadruplex—"Construction Completion and Inspection Certification for Activities <br /> Associated with a Private Single-Family Dwelling Unit" [Form 62-330.310(3)); or <br /> b. For all other activities—"As-Built Certification and Request for Conversion to <br />
The URL can be used to link to this page
Your browser does not support the video tag.